NJ1 el. & FREAK el. compact bike usage instructions
50
Subsequent inspection:
After another 1000 km or 1 year after the last inspection or after heavy
use
Serial number:
___________________
Kilometre reading: _______________________
OK /
carried out
not OK
resolved
Check that all screws/fastening elements are firmly seated and
replace, if necessary (particularly the following: M8x35 oval head
screws (for the handle rotation axes on the cranks)
Clean and oil/grease all pivot points and bearings
Carry out a visual inspection of the frame and attachments for crack
formations, deformations, etc.
Carry out a functional and safety check of the brakes and, where
necessary, replace the brake fluid, brake pads, brake cables
Check, adjust, clean, and oil the gear components including bottom
bracket gearshift (if fitted)
Check the capacity of the rechargeable battery
Check the electrical connections
Check of the control parameters and functionality of the drive sys-
tem; perform a software update if necessary
Check the spoke tension of the drive wheel and, if required, correct
the tension/re-centring and inspect the axle nuts of the drive wheel
for firm seating (tightening torque for neodrives: 30 Nm)
Functional and safety check of the running wheels and drive wheel,
where necessary, replacement of the tyres on the product
Check the wheel track of the running wheels and that the drive
wheel bearings are firmly seated (tightening torque 70 Nm)
Functional and safety check of the back and seating system includ-
ing neck rest (if fitted)
Functional and safety check of the leg rest
Functional and safety check of all lights (if fitted), steering and adap-
tation of the drive unit to the chassis
Test drive/functional test
OK / carried out = OK | not OK = not OK | resolved = the fault was corrected
Comments:
Rehabilitation specialist dealer:
_____________________________________
First name and last name of contact:
_____________________________________
Stamp:
_________________________________________
Date/signature
To maintain the warranty rights, the completed inspection list must be sent by e-mail or post to PRO ACTIV within four weeks of
the inspection.