background image

-18-

- The GLC must be used as a built-in component of an end-use

product.

- The GLC should be installed in the front face of a metal panel.
- If the GLC is installed so as to cool itself naturally, be sure to

install it in a vertical panel.

General Wiring Cautions:

- To prevent shocks or malfunctions, the GLC’s FG (earth) wire

should be grounded according to the following:

1) A maximum grounding resistance of 100

 or less.

2) A grounding wire of  2mm

2

 or larger should be used.

- The GLC’s wiring should be checked to confirm both that the

operating voltage and wiring terminal locations are correct. If ei-
ther the voltage or the wiring terminal locations are incorrect, it
can cause a fire or accident.

- Be sure to secure all wiring terminal screws in place with the

designated torque. Screws and terminals that become loose can
cause a short circuit, fire or accident.

- Be sure that metal filings or wiring remnants do not fall inside the

GLC, since they can cause a fire, accident, or malfunction.

GLC Operation and Maintenance Cautions:

- Be sure to read the GLC’s manual and on-line help information

carefully before performing program changes, forced output, or
utilizing the RUN, STOP, PAUSE, Enable I/O and other commands
while the GLC is in operation. Mistakes concerning the use of
these items can cause a machine accident or damage.

- The liquid crystal panel contains a powerful irritant and if for any

reason the panel is damaged and this liquid enters your eye, flush
your eye for 15 minutes with running water and contact a physcian.

- Prior to inserting or removing a CF Card, be sure to turn the GLC's

CF Card ACCESS switch OFF and to confirm that the ACCESS
lamp is not lit.  If you do not, CF Card internal data may be dam-
aged or  lost.

- Do not turn OFF or reset the GLC while a CF Card is being ac-

cessed or insert or remove the CF Card.  Prior to performing these
operations, create and use a special GLC application screen that
will prevent access to the CF Card.

GLC Unit Disposal Cautions:

- Be sure to dispose of the GLC unit in a manner appropriate to

your country’s industrial machinery disposal standards.

Summary of Contents for GLC2300-LG41-24V

Page 1: ...ident can occur To prevent this be sure to set up external watchdog circuits that will monitor vital output signals Be sure to design a circuit that will supply power to the GLC s I O unit before star...

Page 2: ...fety and reliability When using the GLC with transportation vehicles trains cars and ships disaster and crime prevention devices various types of safety equipment non life support related medical devi...

Page 3: ...rm that the GLC s power cord is unplugged before either cleaning the GLC or at taching detaching the power terminal block screws When replacing the GLC s backlight be sure to unplug the unit s power c...

Page 4: ...e a fire accident or malfunction GLC Operation and Maintenance Cautions Be sure to read the GLC s manual and on line help information carefully before performing program changes forced output or utili...

Page 5: ...mounted at least 100 mm away from any other adjacent structures or machine parts If these conditions are not met the heat gener ated by the GLC s internal components may cause it to fail to meet UL st...

Page 6: ...en carefully packed with special attention to quality However should you find anything damaged or missing please contact your local GLC distributor immediately GLC Unit 1 GLC2300 LG41 24V GLC2300 TC41...

Page 7: ...am features 3 Changing to OFFLINE will release and stop ladder circuit program features Front Rear Bottom D Power Input Terminal Block E Expansion Unit Interface F CF Card Access LED G Serial Interfac...

Page 8: ...CF Card is disabled CF Card with startup data required 2 Reserved Always OFF 3 Reserved Always OFF 4 This setting controls the forced closing of the CF Card cover Forced close enabled Forced close di...

Page 9: ...ctor Dsub25 pinplugXM2A 2501 madebyOMRONCorp RecommendedCover Dsub25 pinCoverXM2S 2511 madebyOMRONCorp RecommendedCover Dsub25 pinCoverXM2S 2521 madebyOMRONCorp RecommendedScrew JackScrewXM2Z 0071 mad...

Page 10: ...ector Pin Arrangement Pin Signal Name Description 1 CD Carrier Detect RS 232C 2 RD Receive Data RS 232C 3 SD Send Data RS 232C 4 ER Enable Receive RS 232C 5 SG Signal Ground 6 DR Data Set Ready RS 232...

Page 11: ...is securely attached to the unit A gasket which has been used for a long period of time may have scratches or dirt on it and could have lost much of its dust and drip resistance Be sure to change the...

Page 12: ...ghten it with a screwdriver Installation fastener Panel GLC Insertion Slots Insertion Slots Top Bottom Tightening the screws with too much force can damage the GP s plastic case The necessary torque i...

Page 13: ...a screwdriver to remove the Power Input Terminal Block s clear plastic cover 3 Unscrew the screws from the middle three 3 terminals align the Ring Terminals and re attach the screws 4 Replace the Pow...

Page 14: ...main circuit lines high voltage high current or input output signal lines Connect a surge absorber to handle power surges To reduce noise make the power cord as short as possible Depending on the inpu...

Reviews: