Maintenance
FP2600-T11 User Manual
6-2
• The gasket must be inserted correctly into the groove for the
FP’s moisture resistance to be equivalent to IP65f.
• The upper surface of the gasket should protrude approximately
2mm out from the groove. Be sure to check that the gasket is
correctly inserted before installing the FP into a panel.
3) Attach the new gasket to the FP. Be
sure to insert the gasket into the GP’s
groove so that the gasket’s groove
sides are vertical.
4) Check if the gasket is attached to the
FP correctly.
To keep your FP unit in its best condition, please inspect the following points peri-
odically.
FP Operation Environment
• Is the operating temperature within the allowable range (0
o
C to 50
o
C )?
• Is the operating humidity within the specified range (30%RH to 85%RH, dry
bulb temperature of 39
o
C or less)?
• Is the operating atmosphere free of corrosive gasses?
Electrical Specifications
• Is the input voltage appropriate (AC85V to AC132V)?
Related Items
• Are all power cords and cables connected properly? Have any become loose?
• Are all mounting brackets holding the unit securely?
• Are there many scratches or traces of dirt on the installation gasket?
6-2 Periodic Check Points
Unit: mm [in.]
2.0 [0.08]