22/46
Chapter 3 Replacement Procedure
3.1 Work Flow
Installation
Screen
Communication
Check the compatibility of
hardware in Chapter 2.
Receive screen data from
GP/ST-3500 series.
*1
Remove GP/ST-3500
series.
Install GP-4500 series.
Connect the power cord.
Check the performance
and start operation.
Change the received data
on GP-Pro EX.
Check and modify the
data on GP-Pro EX.
Transfer the screen data
to GP-4500 series.
Check the connection
between GP4500 series
and a PLC in the GP-Pro
EX Device/PLC
Connection Manual.
Connect GP-4500 series
and PLC with the PLC’s
cable.
Start connection and
check the communi-
cation.
*1:
This step is required if screen data is saved only in the GP unit, not in any other device.
When replacing
GP/ST-3500 series to
GP-4500 series
process
the panel.
Summary of Contents for AGP3500-L1-D24
Page 11: ...11 46 ST 3501T C GP 4501T ...