Design Guide
Page 10
©2015 Prinsco, Inc | 800.992.1725 |
05/15
Table 2 – HS180 Minimum Required Stone Foundation Depth (inches)
4.2
Chamber Row Spacing
The minimum required spacing between chamber rows is 6 inches for the HS75 and 8 inches for
the HS180. This spacing is measured from the outside edges of the chamber feet. The spacing may
be increased if necessary in order to mitigate the effects of weaker native subgrade soils or to
reduce the amount of foundation stone required under the chambers.
Figure 5 - HydroStor Chamber Cross Section
4.4
4.3
4.2
4.1
4.0
3.9
3.8
3.7
3.6
3.5
3.4
3.3
3.2
3.1
3.0
2.9
2.8
2.7
2.6
2.5
2.4
2.3
2.2
2.1
2.0
2
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
12
12
12
15
15
15
2.5
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
12
12
12
12
15
15
15
18
3
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
12
12
12
15
15
15
18
18
18
3.5
9
9
9
9
9
9
9
9
9
9
9
9
9
9
12
12
12
12
15
15
15
18
18
24
24
4
9
9
9
9
9
9
9
9
9
9
9
9
12
12
12
12
15
15
15
15
18
18
24
24
24
4.5
9
9
9
9
9
9
9
9
9
9
9
12
12
12
12
15
15
15
18
18
18
24
24
24
30
5
9
9
9
9
9
9
9
9
9
12
12
12
12
15
15
15
15
18
18
18
24
24
24
24
30
5.5
9
9
9
9
9
9
9
12
12
12
12
12
15
15
15
18
18
18
24
24
24
24
24
30
30
6
9
9
9
9
9
9
12
12
12
12
12
15
15
15
15
18
18
18
24
24
24
24
30
30
30
6.5
9
9
9
9
9
12
12
12
12
12
15
15
15
15
18
18
18
24
24
24
24
30
30
30
30
7
9
9
9
9
12
12
12
12
12
12
15
15
15
18
18
18
24
24
24
24
30
30
30
30
36
7.5
9
9
12
12
12
12
12
15
15
15
15
18
18
18
18
24
24
24
24
24
30
30
30
36
36
8
9
12
12
12
12
12
15
15
15
15
18
18
18
18
24
24
24
24
24
30
30
30
36
36
36
Cover
Height (ft)
Minimum Required Bearing Capacity of Native Soil Subgrade (ksf)
Summary of Contents for HydroStor HS180
Page 1: ...DESIGN GUIDE...
Page 35: ......