
Page 8
Installation Instructions
THE SCM-103 IS HEAVY. IT IS STRONGLY RECOMMENDED THAT THREE PEOPLE PERFORM ALL
INSTALLATION STEPS.
Lifting the Display into Position
Step 1.
Raise the display to the desired height (Refer to the display manufacturer specs on raising the display into position and the
different options available).
IN THE NEXT STEP A LIFTING DEVICE SUCH AS A FORKLIFT , SCISSOR LIFT, OR HOIST WILL NEED TO
BE UTILIZED IN ORDER TO LIFT DISPLAY INTO POSITION. NOT DOING SO COULD RESULT IN PERSON-
AL INJURY OR DAMAGE TO THE DISPLAY.
Pre-Hung
Cable
Scissor Lift
Display Sucured to
Pallet
Fork Lift
SCM-103
The display may be hung from a ceiling structure using two (2) main support cables and two (2) safety cables. Length,
mounting location and method of attachment will be provided by the installer. The components (below) that are used
to hang the SCM-103 are sold separately and may be ordered through Premier Mounts (800) 368-9700.
1/4” stainless steel 7 x 19 wire rope assembly w/
1/2” - 20 NF stainless steel threaded stud with
3-1/2” thread min. on one end only
1/2-20 NF hex nut
(Qty 18)
Flat Washer
(Qty 8)
Cable Access Channel
1/2-20 Threaded Stud
1/4” Cable
1/4” Redundancy Cable
Support Bar
1/2-20 Hex Nut and Flat Washer
1/2-20 Threaded Stud
Bracket Cover
1/2-20 Hex Nut and Flat Washer
1/4” Steel Thimble