
Page 6
Installation Instructions
Step 1.
Insert the lower cover between the vertical mounting brackets.
Step 2.
Attach four (4) 10-32 Kep Nuts and tighten down securing the lower cover into place.
Step 3.
Insert two (2) 8-32 x ½” screws and tighten down the lower cover bracket against the vertical side mounting brackets.
Securing the Lower Cover
THE SCM-103 IS HEAVY. IT IS STRONGLY RECOMMENDED THAT THREE PEOPLE PERFORM ALL
INSTALLATION STEPS.
8-32 x ½”
Screw
10-32 Kep Nut
Securing Tubes to Mounting Brackets
Step 1.
Slide the tubes into the cut outs on the side of the mounting brackets.
Step 2.
Slide the tubes in enough to have an even amount showing on each side of the left & right mounting brackets.
Step 3.
Once tubes are slid into place, tighten all twelve (12) pre-installed set screws located in the display mounting brackets using the
1/8” Allen wrench (supplied). These screws are installed at the factory and are used to lock the tubes into place.
SCM-103
Factory
Installed Set
Screw
Pre Installed
Handy Box
Lower Cover