![Premier Mounts PDS-PLUS Installation Instructions Manual Download Page 13](http://html1.mh-extra.com/html/premier-mounts/pds-plus/pds-plus_installation-instructions-manual_1596278013.webp)
PDS-PLUS/PDS-PLUS-W
Installation Instructions
Visit the Premier Mounts website at http://www.mounts.com
Page 13
Attaching the PDS-PLUS/PDS-PLUS-W Base
Step 2
1)
Raise the projector (with the mounting bracket
attached) and hook the projector bracket over the
hinge pins.
2)
Make sure the bracket is resting on the Base Box
before letting go of the projector.
Step 1
1)
Insert the four (4) adjustment knurl knobs, two (2) per
side.
2)
Tighten all knurl knobs.
Do not overtighten.
Proceed to the
“Base Box Adjustment”
section.
v
Base Box Adjustment
1)
You can adjust the roll of the projector by loosening
the three (3) front and rear knurl knobs.
Do not fully loosen the screws, as the mount may
drop.
2) Set the desired roll and then tighten the screws.
First tighten the center screws and work your way
to the outside screws, making any final adjustments
prior to tightening the last two screws.
3)
You can adjust the tilt of the projector by loosening
the two knurl knobs on each side of the Base Box.
4) Set the desired tilt and then tighten the screws,
making any final adjustments prior to tightening the
last two screws.
5)
Once all adjustments have been made, tighten all
hardware.