4
Step #1a Remove end plate from organizer
assembly.
Step #1b Remove the end plate caps from the
selected cable ports and break out
the tabs.
PLP Tip:
Scoring edges of tabs with knife
makes them break out easier.
End Plate Preparation
Break out entrance ports 3 and 4
for expressed feeder fiber.
Step #1d Break out entrance port 2 for local fiber.
Step #2
Optional Step
For better stability during cable instal-
lation and fiber splicing, install the end
plate onto the COYOTE
®
Dome End
Plate Fixure
(see Steps 3a-b for
installation details).
Optional Step
Install support bracket onto base.
Position sup-
port bracket
onto base and
secure with
wing nuts.
Note: Do not
tighten wing nut
until end plate is
installed.
Base can be
secured to
work surface
with either
clamps or
with bolts.
Loosen wing
nut so slotted
tab of support
bracket can
slide behind
wing nut.
Step #3b Optional Step
Seat the end plate onto the cushion
wedges and secure the support bracket
to the stud of the end plate.
Hand tighten any loose wing nuts to secure end
plate to fixture.
The outside surface of the end
plate must rest against the support
bracket.
Support Bracket
PLP Tip:
Hole in strength member bracket is a guide for
sheath opening.
Step #4
Lay cable into entry point and mark for
grommet and sheath opening locations.
Mark for
sheath
opening
1.75" (45 mm)
Grommet
location
Step #3a
Step #1c