6
Prepare cable for expressed fiber
(buffer tube window cut) applications.
For Applications Where Fiber is
Expressed through the Buffer Tube
Sheath Opening
96" (2.4 m)
Buffer Tube
Opening Location
C (see image
above)
Buffer Tube
Opening
Locations for
Window Cut
C
X
X
C
96" (2.4 m)
OFFICE/C
.O.
Step #9 If shielded cable is being used, install
shield connector on shielded cables.
See Step #16 for recommended
bonding practice.
Follow standard company practices.
Step #10a Lubricate the outer surface of the
grommet.
Lubricate seal-
ing surface of
grommet with
silicone lubri-
cant provided.
Step #10b Position grommet in end plate slot.
For Wide Range 2-Hole
Grommets, make sure
arrows are pointing down
when inserting grommet(s).
Do not align grommet slit
with end plate seam.
Step #12
Step #11
Install cable cap and secure with hex
bolts. Tighten bolts by hand evenly
until cable cap is fully seated.
(DO
NOT USE POWER TOOLS TO
TIGHTEN BOLTS).
Important Note:
Tighten all unused cable caps.
Complete end plate assembly.
PLP Tip:
To start cable cap bolts, apply
pressure with thumb and line
up bolts with inserts. Engage
1 or 2 threads on one of the
bolts. Repeat the process on
opposite bolt. Alternate tight-
ening until fully seated.
Step #8c