Diverging Lat Pulldown Assembly Guide: Assembling the Equipment
6
4.
Attach the cross support to the weight tower using the fasteners removed
previously. Partially tighten the fasteners.
Note:
Be sure to orient the dome washers as shown in the following figure.
Figure 6: Cross support attachment to weight tower
Tightening All Frame Fasteners
Once you have completed assembly, make sure all loose bolts are tightened.
Use the following procedure to fully tighten the bolts that apply to the
equipment you are assembling.
Note:
Begin with the bolts located on the cross support.
To tighten the equipment fasteners:
1.
Tighten the cross support bolts to 500 in-lb (56 N-m) with a
⁵₁₆
-inch hex
tip bit and a 1-inch wrench.
2.
Tighten the 5-inch bolts to 250 in-lb (28 N-m) with a
⁷₃₂
-inch hex tip bit
and a
⁹₁₆
-inch wrench.
3.
Tighten the base and cross support transition plate bolts to 500 in-lb (56
N-m) with a
⁵₁₆
-inch hex tip bit.
Summary of Contents for Discovery DSL0314
Page 1: ... למוצרי הפעלה מדריך Discovery Series Selectorized Line ...
Page 2: ......
Page 44: ... למוצרי הפעלה מדריך Discovery Selectorized Line הערות 42 הערות ...
Page 45: ... למוצרי הפעלה מדריך Discovery Selectorized Line הערות 43 הערות ...
Page 46: ... למוצרי הפעלה מדריך Discovery Selectorized Line הערות 44 הערות ...
Page 47: ......
Page 49: ...Assembly Guide Discovery Series Selectorized Line Diverging Lat Pulldown ...
Page 50: ......
Page 67: ......