C100i Adaptive Motion Trainer
Page 62
11. Slide the large black washer, removed in step 8, onto the upper arm mounting shaft
and fasten the upper arm with the snap ring removed in step 8. replace the large end
cap removed in step 6. It may be necessary to replace the large end cap if it no longer
fits securely in the upper arm.
12. Fasten the upper arm to the upper connecting rod with the bolt removed in step 5.
Torque the bolt to 17 - 21 foot pounds (200 - 250 inch pounds).
13. If you are reusing the rear link mounting hardware, apply loctite accelerator and blue
loctite to the bolts. New replacement hardware does not need to have loctite applied
because it utilizes a loctite patch.
14. Set the replacement rear link in its mounting position on the upper arm. Use a quarter
inch allen wrench to hold the free floating shaft or the bolt and jam nut as described in
step 4, thread one of the mounting bolts into the other side of the free floating shaft and
torque it to 100 to 110 inch pounds. Thread another mounting bolt into the free floating
shaft and torque it to 100 to 110 inch pounds.
15. Set the upper arm’s top cover in place and slide the bottom cover up the rear link.
Fasten the covers with the screws removed in step 1.
16. Repeat steps 1 through 16 with the remaining upper arm.
17. Thoroughly test all AMT functions.