PD6720 Field-Mount Loop-Powered Rate/Totalizer
Instruction Manual
7
Safety Information
•
Read complete instructions prior to installation
and operation of the meter.
•
Installation and service should be performed only
by trained service personnel. Service requiring
replacement of internal components must be
performed at the factory.
•
If the meter is installed in a high voltage
environment and a fault or installation error
occurs, high voltage may be present on any lead.
Installation
Wiring connectors are accessed by opening the
enclosure. To access electrical connectors, remove
the 2 captive screws, then disconnect the ribbon
cable from the display module and set the display
module aside.
Unpacking
Remove the meter from box. Inspect the packaging
and contents for damage. Report damages, if any, to
the carrier.
If any part is missing or the meter malfunctions,
please contact your supplier or the factory for
assistance.
Pre-Installed Conduit Plug
The PD6720 is supplied with two pre-installed conduit
plugs for installations that do not require the use of all
three conduit entries.
Mounting
The PD6720 has two slotted mounting flanges that
may be used for pipe mounting or wall mounting.
Alternatively, the unit may be supported by the
conduit using the conduit holes provided.
Refer to
and
•
Do not attempt to loosen or remove flange bolts
while the meter is in service.
Dimensions
All units: inches [mm]
Figure 1. Enclosure Dimensions
– Front View
Figure 2. Enclosure Dimensions
–
Side Cross Section View