background image

10

11

Step 3:

 Make sure that the door leaf does not jam in the opening and closing 

movement. The sliding gate rail shall be perfectly rectilinear, level, unobstructed 

periodically from any element or dirt which makes it difficult to slide the pulleys 

over their entire length, as shown in the figure below.

INSTALATION AND FIXATION OF THE AUTOMATOR

Before installing the automation system, remove any unnecessary cables and 

disable any equipment or system connected to the mains.

EQUIPMENT DIMENSIONS

The correct operation of this equipment depends on the instructions in this 

manual. To fix the equipment, proceed as follows:

Step 1:

 Make sure that the floor is firm enough so that the equipment can be 

screwed so that it is level. If it does not comply with the requirement, provide a 

concrete base, following the guidelines below:

Step 2:

 Base dimensions should be appropriate for the dimensions of the 

automation. The concrete base should be at a distance of approximately 20 mm 

from the face of the door leaf.

Step 3:

 Once the conditions have been met, open entirely the gate and position 

the automator next to the face of the gate leaf, obeying the 50 mm measurement 

between the leaf end and the automator.

GATE LEAF

SIDE VIEW

CONCRETE BASE

Summary of Contents for DZ RIO 350 JET FLEX

Page 1: ...S LTDA Av Dr Labieno da Costa Machado 3526 Distrito Industrial CEP 17400 000 Gar a SP Brasil www ppa com br 0800 550 250 ATTENTION Do not operate the equip ment without first reading the instruction m...

Page 2: ...y is compatible with that required on the equipment identification labe Do not connect the mains until installation maintenance is complete Always make electrical connections to the control unit with...

Page 3: ...130 C Class B 130 C TRAVEL STOP Analogic Digital Analogic Digital Hybrid Maximum gate leaf mass 400 Kg 400 Kg 400 Kg MAXIMUN GATE DIMENSION HEIGHT 2 5 m LENGTH 3 0 m HEIGHT 2 5 m LENGTH 3 0 m HEIGHT...

Page 4: ...REQUENCY 60 Hz 60 Hz 60 Hz NOMINAL POWER 450 W 395 W 140 W 170 W ENGINE RPM 1740 RPM 1740 RPM 4365 rpm NOMINAL CURRENT 2 1 A 3 1 A 1 1 A 1 7 A REDUCTION 1 23 1 23 1 23 LINEAR VELOCITY 17 1 m min Z18 1...

Page 5: ...d closing properly Open the gate manually and observe the effort required This effort should be minimal for the entire length of the course Step 2 Close the gate manually and check whether the exertio...

Page 6: ...on of this equipment depends on the instructions in this manual To fix the equipment proceed as follows Step 1 Make sure that the floor is firm enough so that the equipment can be screwed so that it i...

Page 7: ...ll back the automation Step 6 With the automator unlocked position the rack bar on the gear and aligned with the gate It is necessary to leave approximately a clearance of 2 mm between the top of the...

Page 8: ...ly attach the automation to the floor or concrete base tightening the bolts ANALOG END OF COURSE INSTALLATION Step 1 With the gate closed place the magnet holder in the rack positioned in front of the...

Page 9: ...cessary invert the connector on the board After attaching the magnet holders make final adjustments by moving them to the right or left depending on the setting you want Step 4 To finalize the install...

Page 10: ...Make sure that the power supply is connected correctly B Replace fuse with the same specification C Make sure that there is no object blocking the operation of the gate D Replace the end of course sys...

Reviews: