background image

14

15

Step 8:

 If the door leaf is warped, provide shims to ensure the alignment of the 

rack. There are cases where the rack should pass the length of the sheet. In this 

case, arrange a French hand so that you do not jump its teeth when starting the 

machine.

Step 9:

  After attaching the rack, firmly attach the automation to the floor or 

concrete base, tightening the bolts.

ANALOG END OF COURSE INSTALLATION

Step 1:

 With the gate closed, place the magnet holder in the rack, positioned in 

front of the REED of the automation. This magnet will act as a closing course end.

FRENCH HAND

securely tighten 

the s 1/4 X 2 1/2 screws 

for fiXation

securely tighten 

the s 1/4 X 2 1/2 screws 

for fiXation

support of
the magnet

gate closing procedure

support of
the magnet

support of

the reed

upper View

Summary of Contents for DZ RIO 350 JET FLEX

Page 1: ...S LTDA Av Dr Labieno da Costa Machado 3526 Distrito Industrial CEP 17400 000 Gar a SP Brasil www ppa com br 0800 550 250 ATTENTION Do not operate the equip ment without first reading the instruction m...

Page 2: ...y is compatible with that required on the equipment identification labe Do not connect the mains until installation maintenance is complete Always make electrical connections to the control unit with...

Page 3: ...130 C Class B 130 C TRAVEL STOP Analogic Digital Analogic Digital Hybrid Maximum gate leaf mass 400 Kg 400 Kg 400 Kg MAXIMUN GATE DIMENSION HEIGHT 2 5 m LENGTH 3 0 m HEIGHT 2 5 m LENGTH 3 0 m HEIGHT...

Page 4: ...REQUENCY 60 Hz 60 Hz 60 Hz NOMINAL POWER 450 W 395 W 140 W 170 W ENGINE RPM 1740 RPM 1740 RPM 4365 rpm NOMINAL CURRENT 2 1 A 3 1 A 1 1 A 1 7 A REDUCTION 1 23 1 23 1 23 LINEAR VELOCITY 17 1 m min Z18 1...

Page 5: ...d closing properly Open the gate manually and observe the effort required This effort should be minimal for the entire length of the course Step 2 Close the gate manually and check whether the exertio...

Page 6: ...on of this equipment depends on the instructions in this manual To fix the equipment proceed as follows Step 1 Make sure that the floor is firm enough so that the equipment can be screwed so that it i...

Page 7: ...ll back the automation Step 6 With the automator unlocked position the rack bar on the gear and aligned with the gate It is necessary to leave approximately a clearance of 2 mm between the top of the...

Page 8: ...ly attach the automation to the floor or concrete base tightening the bolts ANALOG END OF COURSE INSTALLATION Step 1 With the gate closed place the magnet holder in the rack positioned in front of the...

Page 9: ...cessary invert the connector on the board After attaching the magnet holders make final adjustments by moving them to the right or left depending on the setting you want Step 4 To finalize the install...

Page 10: ...Make sure that the power supply is connected correctly B Replace fuse with the same specification C Make sure that there is no object blocking the operation of the gate D Replace the end of course sys...

Reviews: