14
15
Step 8:
If the door leaf is warped, provide shims to ensure the alignment of the
rack. There are cases where the rack should pass the length of the sheet. In this
case, arrange a French hand so that you do not jump its teeth when starting the
machine.
Step 9:
After attaching the rack, firmly attach the automation to the floor or
concrete base, tightening the bolts.
ANALOG END OF COURSE INSTALLATION
Step 1:
With the gate closed, place the magnet holder in the rack, positioned in
front of the REED of the automation. This magnet will act as a closing course end.
FRENCH HAND
securely tighten
the s 1/4 X 2 1/2 screws
for fiXation
securely tighten
the s 1/4 X 2 1/2 screws
for fiXation
support of
the magnet
gate closing procedure
support of
the magnet
support of
the reed
upper View