Step 4:

 Pre-align the automation to the gate, positioning the rack over the gear 

and pushing the assembly against the gate. Then mark the fixing holes in the floor 

or concrete base.

Step 5:

 Drill for fastening by positioning the automator aligned to the gate. Before 

tightening the S ¼ “x 2 ½” bolts, move the gate, making sure that it does not lean 

against the automator during its course. If this occurs, pull back the automation.

Step 6:

 With the automator unlocked, position the rack bar on the gear and aligned 

with the gate.

It is necessary to leave approximately a clearance of 2 mm between the top of the 

gear tooth and the bottom of the cog of the rack.

Step 7:

 Secure the rack to the entire length of the door leaf with solder or screw 

every 300 or 400 mm.

MARK THE FIXING 

HOLES IN THE FLOOR

MARK THE FIXING 

HOLES IN THE FLOOR

AuTOmATION 

FIxING hOLES

INSERT 2 SCREWS
S 1/4” x 2 1/2” WITh

S10 ADApTER SLEEVE

INSERT 2 SCREWS
S 1/4” x 2 1/2” WITh

S10 ADApTER SLEEVE

CLEARANCE OF 2 MM

300 OR

400 mm

300 OR

400 mm

Summary of Contents for DZ RIO 350 JET FLEX

Page 1: ...S LTDA Av Dr Labieno da Costa Machado 3526 Distrito Industrial CEP 17400 000 Gar a SP Brasil www ppa com br 0800 550 250 ATTENTION Do not operate the equip ment without first reading the instruction m...

Page 2: ...y is compatible with that required on the equipment identification labe Do not connect the mains until installation maintenance is complete Always make electrical connections to the control unit with...

Page 3: ...130 C Class B 130 C TRAVEL STOP Analogic Digital Analogic Digital Hybrid Maximum gate leaf mass 400 Kg 400 Kg 400 Kg MAXIMUN GATE DIMENSION HEIGHT 2 5 m LENGTH 3 0 m HEIGHT 2 5 m LENGTH 3 0 m HEIGHT...

Page 4: ...REQUENCY 60 Hz 60 Hz 60 Hz NOMINAL POWER 450 W 395 W 140 W 170 W ENGINE RPM 1740 RPM 1740 RPM 4365 rpm NOMINAL CURRENT 2 1 A 3 1 A 1 1 A 1 7 A REDUCTION 1 23 1 23 1 23 LINEAR VELOCITY 17 1 m min Z18 1...

Page 5: ...d closing properly Open the gate manually and observe the effort required This effort should be minimal for the entire length of the course Step 2 Close the gate manually and check whether the exertio...

Page 6: ...on of this equipment depends on the instructions in this manual To fix the equipment proceed as follows Step 1 Make sure that the floor is firm enough so that the equipment can be screwed so that it i...

Page 7: ...ll back the automation Step 6 With the automator unlocked position the rack bar on the gear and aligned with the gate It is necessary to leave approximately a clearance of 2 mm between the top of the...

Page 8: ...ly attach the automation to the floor or concrete base tightening the bolts ANALOG END OF COURSE INSTALLATION Step 1 With the gate closed place the magnet holder in the rack positioned in front of the...

Page 9: ...cessary invert the connector on the board After attaching the magnet holders make final adjustments by moving them to the right or left depending on the setting you want Step 4 To finalize the install...

Page 10: ...Make sure that the power supply is connected correctly B Replace fuse with the same specification C Make sure that there is no object blocking the operation of the gate D Replace the end of course sys...

Reviews: