
4.5. Case Earthing
The Eco Battery case
is designed to be electrically
floating and isolated from all internal battery
connections and in most installations will not require earthing. However should your application require the
case to be grounded a 5mm M6 bolt should be used and is supplied with the battery.
Eco P Series Installation Manual V3.0
21/10/2021
Page
of
20
37