
4.2. Battery Installation
PowerPlus Energy highly recommends our range of Rack or SlimLine Series indoor and outdoor cabinets.
Full Specification details are available on the PowerPlus Energy web page, however specific installations
details are further along in this manual.
4.2.1. Custom Cabinets
The battery has been designed to fit into a standard 800mm deep 19inch rack enclosure.
If you are building your own enclosure, ensure the below is considered in your design.
• If the battery is installed in to enclosures without rails, please ensure that they are securely seated to
prevent accidental damage or tampering.
• If a custom enclosure or mounting method is used please ensure the batteries are not stacked more than
6 high unless battery support rails are used to distribute weight.
• Please ensure there is adequate air flow around the battery stack within the cabinet. 15mm minimum
around 4 side of the stack is required as minimum.
• Please ensure the selected IP rating is correct as per your location selection.
• All interconnecting battery cables for parallel connection shall be the same length and cable size.
• A busbar is recommended for connection of all parallel battery connections.
• An appropriate way of connecting the cabinet to the PCE should be considered.
• Please follow PCE instructions for fuse, cable and connection requirements. These will vary depending on
brand and product selected.
Eco P Series Installation Manual V3.0
21/10/2021
Page
of
17
37