
Step
4:
attaching
the
pedal
tubes
Attach
the
left
pedal
tube
(48L)
to
the
left
crank
(60L)
with
two
plastic
washers
(56),
washer
(55)
and
a
nylon
nut
(54).
Attach
the
left
pedal
tube
(48L)
to
the
left
tube
moving
handle
(36L)
with
the
allen
bolt
(47),
washer
(22)
and
nylon
nut
(37).
Attach
the
right
pedal
tube
(48R)
in
the
same
way.
Step
5:
attaching
the
moving
handles
Attach
the
left
moving
handle
(34L)
on
the
left
bar
with
two
nylon
nuts
(37),
two
semi
‐
circular
washers
(24)
and
two
screws
(35).
Attach
the
right
moving
handle
(34R)
in
the
same
way.
29
Summary of Contents for FET8326P
Page 5: ...HET PRODUCT 5...
Page 23: ...THE PRODUCT 23...
Page 41: ...DAS PRODUKT 41...
Page 59: ...LE PRODUIT 59...
Page 77: ...V ROBEK 77...