LEFT HAND/RIGHT HAND CONVERSIONS
1. Determine the hand of the operator required for this
installation by referring to the illustration below.
LEFT HAND
RIGHT HAND
Note
:
Operators are wired for Right Hand
operation at the factory.
2. Place the Yellow and Blue wires in the appropriate
positions, as shown below, for Right Hand or Left Hand
operation.
Note
: If operator hand is being changed, limits
MUST
be reset.
GREEN
BLUE
YELLOW
GRAY
GREEN
BLUE
YELLOW
GRAY
BACK OF MOTOR,
LEFT HAND MOTOR CONNECTIONS
BACK OF MOTOR,
RIGHT HAND MOTOR CONNECTIONS
18
MANUAL OPERATION
▲
WARNING: TURN OFF POWER SUPPLY BEFORE
REMOVING COVER.
1. Remove (4) cover mounting screws and lift off top cover.
2. Remove crank pin from storage area in drive frame. See
Diagram.
Note: This will disengage interlock and prevent
power from returning to the operator during manual
operation
.
3
.
Insert crank pin in timing
pulley as shown in
diagram. Rotate timing
pulley with crank pin
until desired position is
achieved.
4. To resume powered
operation, remove crank
pin from timing pulley and
replace in storage area on
drive frame.
▲
Note: Be sure drive pin is fully inserted back into drive
frame in order to activate interlock.
5. Replace cover and secure with (4) mounting screws.
6. Turn on supply power to operator.
CRANK
PIN
TIMING
PULLEY
TOP COVER