14
S T E P
4
Be careful to assemble all components in
the sequence they are presented.
A.
Attach Press Arm Pivot (Q) to Upper Main Frame (D) as shown using Shaft (16) and:
Two 99 (10mm x 20mm allen head bolt)
Two 101 (10mm washer)
Two 100 (bronze bushing)
Tighten the two Allen Screws (8) in the Upper Main Frame(D)
B.
Attach Right Handle (S)* and Left Handle (T)* to Press Arm (R) as shown using for each handle:
One 51 (10mm x 60mm allen head bolt)
One 70 (10mm nylon lock nut)
Attach Press Arm (R) to Press Arm Pivot (Q) as shown using Shaft (5) and Steel Bushings (6)*.
Tighten the two Allen Screws (8) in Press Arm (R).
Attach Rubber Stop (19) and Jam Nut (47) as shown into Upper Main Frame(D)
C.
*NOTE:
To identify the difference between left and right: notice in the picture in Step 4 the horizontal grips point
out ward, and the smaller grip is angled toward the front of the gym.
*NOTE:
These parts might be pre-installed.
*NOTE:
These parts might be pre-installed.
*NOTE:
Leave the two bolts (50) hand tight.
You will need to install a shroud after cable installation in Step 7.
D.
Install two 110mm diameter Pulleys (4) into Press Arm Pivot (Q) as shown using:
Two 50 (10mm x 215mm allen head bolts)*
Four 3 (pulley spacer)
Four 60 (10mm washer)
Two 70 (10mm nylon lock nut)
E
F
You can now wrench tighten all bolts and nuts in this step. Do NOT re-tighten any of the pad bolts.
Leave all pulley bolts hand tight until the cable installation in Step 13 is completed.
Insert End Caps (1)* to Press Arm Pivot (Q) as shown.
Insert End Caps (7)* to Press Arm (R) as shown.
Insert Round Pop Pin (13)* to Press Arm (R) as shown.
0
10
20
30
40
50
60
70
80
90
100 110 120 130 140 150
0
1
2
3
4
5
6
MM
Inch
Summary of Contents for P2 X
Page 1: ...P 2 X O W N E R S M A N U A L...
Page 2: ...2...
Page 9: ...9 S T E P 1...
Page 11: ...11 S T E P 2...
Page 13: ...13 S T E P 3...
Page 15: ...15 S T E P 4...
Page 17: ...17 S T E P 5...
Page 19: ...19 S T E P 6...
Page 21: ...21 S T E P 7 S T E P 7B...
Page 23: ...23 S T E P 8 S T E P 8B...
Page 25: ...25 v S T E P 9 S T E P 9B...
Page 27: ...27 S T E P 10 S T E P 10B...
Page 29: ...29 S T E P 11 S T E P 11B...
Page 31: ...31 S T E P 12 S T E P 12B...
Page 33: ...33 S T E P 13 S T E P 13B...
Page 35: ...35...
Page 47: ...ANATOMY CHART 47...
Page 48: ...FITNESS GOAL 48...
Page 49: ...EXERCISE LOG 49...
Page 50: ...EXERCISE LOG 50...
Page 51: ...EXERCISE LOG 51...
Page 62: ...EXPLODED VIEW DIAGRAM...
Page 63: ......
Page 65: ...PLACE STAMP HERE FROM Name Address Apt City State Zip Code...