Be careful to assemble all components in the sequence they are presented.
NOTE:
All Pulleys in this step are 110mm diameter,except where noted in Step 11B.
Leave all pulley bolts hand tight until Step 13 is completed.
0
10
20
30
40
50
60
70
80
90
100 110 120 130 140 150
0
1
2
3
4
5
6
MM
Inch
A.
3340 mm
Ball Stop End
Stamped Eye End
Back Pull Pulley Cable(105)
See Diagram 1. Insert stamped eye end of Back Pull Pulley Cable (105) into the opening in Leg
Extension Arm (K), where pulley (C1) will be installed. Insert Cable (105) into and through Lower Main
Frame (A). Run Cable (105) along the top of the frame and into and through Lower Main Frame (A)
again and pull entire length of Cable (105) through as shown in Diagram 1.
B.
See Diagram 2. Install 90mm diameter Pulley (C1), over Cable (105) and into Leg Extension Arm (K) as
shown using:
One 52 (10mm x 95mm hex head bolt)
Two 14 (pulley spacer)
One 70 (10mm nylon lock nut)
C.
See Diagram 2. Install Pulley (C2), over Cable (105) and into Lower Main Frame (A) as shown using:
One 52 (10mm x 95mm hex head bolt)
Two 14 (pulley spacer)
One 70 (10mm nylon lock nut)
D.
See Diagram 2. Install Pulley (C3), under Cable (105) and into Lower Main Frame (A) as shown.
Remove previously assembled fasteners from Step 1 to install pulley.
E.
See Diagram 1. Route Cable (105) up through the opening in the Lower Main Frame (A).
See Diagram 2. Install Pulley (C4), over Cable (105) and into Lower Main Frame (A) as shown using:
One 52 (10mm x 95mm hex head bolt)
Two 14 (pulley spacer)
One 70 (10mm nylon lock nut)
F.
G.
One 53 (10mm x 45mm hex head bolt)
Two 60 (10mm washer)
One 70 (10mm nylon lock nut)
See Diagram 1. Route Cable (105) up through the two floating pulley bracket (AB).
Install Pulley (C5) under Cable (105) into floating pulley bracket (AB) as shown using:
See Diagram 1. Attach the stamped eye end of Cable (105) to Lower Main Base Frame (A) using:
One 98 (10mm x 110mm hex head bolt)
Two 60 (10mm washer)
One 70 (10mm nylon lock nut)
Summary of Contents for P2 X
Page 1: ...P 2 X O W N E R S M A N U A L...
Page 2: ...2...
Page 9: ...9 S T E P 1...
Page 11: ...11 S T E P 2...
Page 13: ...13 S T E P 3...
Page 15: ...15 S T E P 4...
Page 17: ...17 S T E P 5...
Page 19: ...19 S T E P 6...
Page 21: ...21 S T E P 7 S T E P 7B...
Page 23: ...23 S T E P 8 S T E P 8B...
Page 25: ...25 v S T E P 9 S T E P 9B...
Page 27: ...27 S T E P 10 S T E P 10B...
Page 29: ...29 S T E P 11 S T E P 11B...
Page 31: ...31 S T E P 12 S T E P 12B...
Page 33: ...33 S T E P 13 S T E P 13B...
Page 35: ...35...
Page 47: ...ANATOMY CHART 47...
Page 48: ...FITNESS GOAL 48...
Page 49: ...EXERCISE LOG 49...
Page 50: ...EXERCISE LOG 50...
Page 51: ...EXERCISE LOG 51...
Page 62: ...EXPLODED VIEW DIAGRAM...
Page 63: ......
Page 65: ...PLACE STAMP HERE FROM Name Address Apt City State Zip Code...