Installation - Page 17
2.4
Install the Optional
Programmer
1.
Carefully remove the blanking panel from
the facia and locate the programmer into
the cut out.
2.
Remove the two plastic sleeves and
connect the programmers electrical plug
onto position J4 on the circuit board.
3.
Connect the 3 way terminal block to the
metal work immediately below the
programmer using the two screws
provided.
2.5
Connect the Gas Supply
Ensure that the gas supply is isolated. Connect
the gas supply using a suitable adaptor to the
gas cock.
Important:
Do not solder the fitting whilst
assembled to the gas cock.
The pipe diameter required will depend on the
boiler model and the pipe length from the gas
meter. Ensure that the gas supply pipe is
selected in accordance with BS 6891 so that an
adequate gas supply to the boiler is provided.
Do not turn the gas supply on at this stage.
J5
J6
Programmer
Facia
Terminal Block
(3 way)
Orange
Violet
Yellow
Circuit
Board
J9
S
U
P
0
0
2
6
A
Blue
Brown
J4
Connector
(2 way)
J4
Remove the two
plastic sleeves
Terminal
Block
Securing
Clips
Facia
Summary of Contents for Suprima 100
Page 10: ...Installation Requirements Page 10 ...
Page 12: ...Flue Kits Page 12 Installation instructions included as necessary with each kit ...
Page 13: ...Other Kits Page 13 Installation instructions included as necessary with each kit ...
Page 31: ...6 Wiring Diagram Page 31 ...
Page 32: ......
Page 34: ...7 Fault Finding Guide Page 33 ...
Page 36: ......
Page 37: ...8 Short List of Spare Parts Page 34 SUP0083D L 365mm L 365mm L 462mm L 476mm ...