Installation Requirements - Page 6
S
U
P
0
0
7
0
B
Side
View
Boiler Dimensions
Remove The Outer Case
Boiler Clearances
Flow
(22mm) Return
(22mm)
200
200
Side
Cover
Wall
Wall
Top of
Flue
Boiler
Chassis
34
122.5
137.5
61
255
260 (To Wall)
315
400
485.5
600
105
53
33
29
60
Mounting
Bracket
Unscrew the
side panel
securing screw
Slide the side panel
forward and lift-off casing
Open the
controls door
Unscrew the
front cover
securing
screws
5
4
1
2
3
660
5
5
125
Bottom
Clearance
Side
Clearance
Side
Clearance
Top
Clearance
Front
Clearance
All Dimensions in mm
275
15
410
50
Hinge forward, pull bottom
of cover forward and lift-off
40
85
Gas
Valve
15
Front
Injector
Manifold
Rc ½"
½" B.S.P.
Female
Gas Cock
Gas
Valve
25
25
Front
View
Servicable
Clearance
610
Summary of Contents for Suprima 100
Page 10: ...Installation Requirements Page 10 ...
Page 12: ...Flue Kits Page 12 Installation instructions included as necessary with each kit ...
Page 13: ...Other Kits Page 13 Installation instructions included as necessary with each kit ...
Page 31: ...6 Wiring Diagram Page 31 ...
Page 32: ......
Page 34: ...7 Fault Finding Guide Page 33 ...
Page 36: ......
Page 37: ...8 Short List of Spare Parts Page 34 SUP0083D L 365mm L 365mm L 462mm L 476mm ...