8.0 Installation
23
8.8
Making The Electrical Connections
To connect the mains input cable proceed as
follows:-
1. Slacken the facia securing screws and lift the
outercase panel so that its securing tabs are
clear of the facia. Remove the panel.
2. Remove the screws securing the facia panel
and hinge it down (Fig. 24).
3. Remove the control box cover securing
screws. Disengage the barbs on the control box
from the cover. Remove the cover (Fig. 25).
4. Slacken the cable clamp on the LH side of the
boiler chassis (Fig. 26). Insert the cable through
the clamp and route it to the terminal block.
5. Slacken the screws in the terminal block,
connect the input cable, and tighten the screws.
6. If an external control is to be connected it can
be done at this point. Run the input cable from
the external control through the second cable
clamp on the boiler chassis. Refer to the
instructions supplied with the control.
7. To connect external control(s) remove the link
between terminals 1 & 2. The switched output
from the external control must be connected to
terminal 2 (Fig. 27).
IMPORTANT:
The external control
MUST
be
suitable for 230V switching and fused 3A
maximum
8. Ensure that both mains input and, where fitted,
external control input cables have sufficient slack
to allow the control box to drop down. Tighten the
cable clamp(s) on the boiler chassis.
8.9
Preliminary Electrical Checks
1. Prior to commissioning the boiler preliminary
electrical system checks should be carried out.
2. These should be performed using a suitable
meter, and include checks for Ground Continuity,
Resistance to Ground, Short Circuit and Polarity.
Always fit fast
blow 2A fuse
230V ~ 50Hz
fused 3A maximum
Live (brown)
Neutral (blue)
Earth (green/yellow)
1
2
230V S/L from
external control
br
b
g/y
bk
bk
L
230 V
Selector /
Reset Switch
External
Controls
N
br
b
Pump
Hydraulic Differential Pressure Switch
r
r
Safety Overheat Thermostat
b
b
Central Heating
NTC Sensor
r
r
Gas Valve
Spark Electrode
Spark
Generator
Flame Sensing Electrode
N
br
b
Fan
N
b
b
br
bk
bk
br
r
Pressure Switch
b
br
bk
PCB
b
b
br
r
bk
bk
br
Primary Return Sensor
g
g
Gas Valve Modulator
Fig. 26
Fig. 25
Fig. 27
Fig. 28
Fig. 24
Terminal Block
Internal Fuse
Cable Clamp
Control Box Cover
Facia Panel
Functional Flow Diagram
Key to Wiring
b - blue
br - brown
bk - black
r - red
g - green