Potterton declare that no substances harmful to
health are contained in the appliance or used
during appliance manufacture.
1.1
Description
1. The Potterton Osprey 2 CFL is a fully automatic
gas fired floor standing conventionally flued boiler
with a cast iron heat exchanger.
2. The boiler is designed for use with fully pumped
open vented or sealed water systems with an
indirect hot water cylinder.
3. The boiler is available in outputs of 35.0, 43.0,
52.8 and 64.5kW
4. It is designed for use on Natural Gas (G20).
5. The boiler data badge is positioned on the boiler
inner front panel.
6. The boiler is intended to be installed in
residential / commercial / light industrial E.M.C.
environments on a governed meter supply only.
7.
All systems must be thoroughly flushed and
treated with inhibitor (see section 6.2).
1.2
Installation
1. The appliance is suitable for installation only in
G.B. and I.E. and should be installed in accordance
with the rules in force. For Ireland install in
accordance with I.S.813 “Installation of Gas
Appliances”. The installation must be carried out by
a CORGI Registered Installer or other competent
person and be in accordance with the relevant
requirements of current Gas Safety (Installation
and Use) Regulations, the Building Regulations
(Scotland) (Consolidation), the Local Building
Regulations, the Current I.E.E. Wiring Regulations
and the bye laws of the Local Water Undertaking.
Where no specific instructions are given, reference
should be made to the relevant BRITISH
STANDARD CODES OF PRACTICE.
1.0 Introduction
4
“Benchmark” Log Book
As part of the industry-wide “Benchmark” initiative all Baxi boilers now
include an Installation, Commissioning and Service Record Log Book.
Please read the Log Book carefully and complete all sections relevant to
the appliance and installation. These include sections on the type of
controls employed, flushing the system, burner operating pressure etc.
The details of the Log Book will be required in the event of any warranty
work. Also, there is a section to be completed at each subsequent regular
service visit. The Log Book must be left with the user.
Fig. 1
NOTE:
This appliance must be installed in
accordance with the manufacturer’s instructions
and the regulations in force. Read the instructions
fully before installing or using the appliance.
Inner Front Panel
Data Badge