7.0 Installation
13
7.1
Initial Preparation
The gas supply, gas type and pressure must
be checked for suitability before connection.
1. Ensure that the floor or base on to which the
boiler is to be fitted is clean and free from debris.
2. Install any pipework that will be behind the
boiler, and any appropriate flue components.
3. Manoeuvre the boiler into position, seeking
assistance as necessary. Check the clearances
as shown in Section 6.3.
4. Undo the two securing screws and remove the
top panel.
5. Disengage the front panel from the retaining
magnets and hinge forwards. Unhook the panel
from the lower hinge pins (Fig. 10) and place to
the right hand side, taking care not to stretch the
earth wire.
6. Remove the flue spigot from inside the case
and fit it to the boiler draught diverter (Fig. 11).
Important: Only use the flue spigot supplied.
Do not use a proprietary item.
7. Connect the gas supply pipe and the system
flow and return connections to the boiler (Fig. 12).
8. Connect the flue system to the flue spigot. Any
flue pipe must be at least the same diameter as
the connection on the boiler draught diverter
Securing
Screws
Top Panel
Magnets
Front Panel
Flue Spigot
Return
Connection
Gas Inlet
Flow
Connection
Fig. 10
Fig. 11
Fig. 12
Boiler Draught
Diverter
Connection