iHE
8
Central Floor
fi
xing method (two plates required)
If the central
fi
xing positions are unsuitable for the
installation, alternative positions can be utilised in
the corners. (
Fig 2.2
) This method can only be used
if the installer has kept the pallet
fi
xing plates and
has four plates in total.
Follow points 1 - 4 above for
fi
xing instructions.
I
NSTALLATION
INTO
EXISTING
HEATING
SYSTEMS
Before replacement of an existing boiler, it
is necessary to thoroughly clean out the
old system
fi
rst. This is best achieved intro
ducing a basic cleaning solution 4 weeks
before the substitution.
When the appliance is installed on existing systems,
please ensure you have considered the following
before commissioning:
-
If you intend to use the existing
fl
ue on a B23
category system, check that
fl
ue outlet is suitable
for condensing boilers, is the correct size, is correct
for the temperature of the products of combustion
and is manufactured according to current
regulations. It must be tested for soundness and
must not have any restrictions or defects. Also
ensure that the
fl
ue outlet pipe has a connection for
the discharge of condensate. For all other
fl
ue
types, it is recommended that a completely new
fl
ue system is installed.
-
The boiler room has a suitable outlet for the
discharge of condensate produced.
-
The electrical connections comply with the current
electrical standards and the work has been carried
out by a suitably quali
fi
ed person.
-
The gas supply pipework is constructed to the
current regulations in force.
-
The expansion vessels and associated
fi
ttings are
correctly sized to absorb the total expansion of the
system and in tested working order.
-
The circulation pump’ s output, the head and
fl
ow
direction are suitable.
-
The complete system has been cleaned of
impurities and lime scale.
I
NSTALLATION
INTO
NEW
HEATING
SYSTEMS
It is recommended to thoroughly clean out the new
system
with a system
fl
ush product, before commis-
sioning the appliance.
S
YSTEM
I
NHIBITORS
&
P
H
LEVELS
After cleaning and
fl
ushing of the system, it should be
fi
lled with an appropriate inhibitor/antifreeze treatment
to maintain pH levels of between 7.5 & 9.5pH.
The following system treatments have been tested
and are recommended for use in this appliance:
FERNOX
SENTINEL
Inhibitors
Protector/Alphi 11
X100, X500
Noise reducer
X200
Universal cleaner
Restorer
X300
Sludge remover
Protector, Restorer
X400
Antifreeze
Alphi 11
X500
Fig 2.2
Summary of Contents for iHE 100/300
Page 1: ...M6500 M6500 ...
Page 21: ...iHE 19 Fig 4 3 WIRING DIAGRAM PCB 1 ...
Page 22: ...iHE 20 WIRING DIAGRAM PCB 2 3 Fig 4 4 ...
Page 34: ...iHE 32 APPLIANCE COMPONENTS Fig 7 1 21 20 17 22 19 18 16 24 25 26 27 28 29 23 ...
Page 39: ...NOTES ...
Page 40: ...Publication Date 01 09 12 ...