Installation Section – Page 8
Because the pipework connections are behind the boiler backplate, short lengths of pipe should be connected to the
appropriate tappings before the boiler is lifted into position, and terminated just clear of the boiler for connecting to
the system pipework. It is recommended that capillary fittings are used.
FIG. 4 MOUNTING FEATURES
(Flamingo RS4O illustrated)
Page 8
Installation Section – Page 9
A Combined Gravity System
RS5OS
1. Connect a suitable length of 28mm pipe with 90º elbow to either the R.H. or L.H. 1" B.S.P. rear facing flow
connections. (Hot water)
2. Connect a suitable length of 22mm pipe with 90º elbow to the remaining 1" B.S.P. rear facing flow connection.
(Central heating)
3. Connect a suitable length of 28mm pipe with 90º elbow to either the R.H. or L.H. 1" B.S.P. rear facing return
connections. (Hot water)
Summary of Contents for Flamingo RS40
Page 6: ...FIG 2 PRESSURE LOSS ACROSS BOILER Page 4 DATA SECTION Page 5 ...
Page 14: ...FIG 8 GRAVITY HOT WATER WITH TEMPERATURE CONTROLLED AND PUMPED CENTRAL HEATING ...
Page 18: ...Page 13 ...
Page 29: ...FIG 15 F F D AND THERMOCOUPLE Page 21 Service Section Page 22 FIG 16 SOLENOID VALVE ...
Page 31: ...Back page Page 23 ...