FIGURE I 

 
 

Torque Arm (No. 2082 Curtains Only) 

 

The torque arm drive must be installed and positioned as described in step # 8.  Before proceeding with the test, verify that the torque arm 
drive is properly positioned (i.e. torque arm is in horizontal position, approximately ninety degrees to floor surface).  After verifying the 
torque arm drive position, the assembly is ready to be operated.  First, operate the curtain in the “up” direction while observing the rotation 
direction of the torque arm belt.  The torque arm belt must be wrapping in the direction shown for the curtain “up” direction of travel.  See 
Figure J.  If the rotation is not correct, reverse the “up” and “down” wires at the key switch terminals. The curtain is now ready for limit 
switch setting.  Refer to the limit switch setting section. 

 

 
 

FIGURE J 

 
16.  LIMIT SWITCH SETTING 
 

The torque motor limits are quickly and easily set by simply depressing and releasing the torque motor limit switches, but first it will be 
necessary to determine which limit switch stops a direction of operation.  This is accomplished by performing the following test.  Remove 
the limit switch protective cover. Depress one switch and release it (switch is now up). Turn the key switch key in one direction.  If the 
curtain does not operate, the switch released controls that direction of travel.  On the other hand if the curtain operates, the other limit 
switch controls that direction of travel.  Reset the limit previously released by pushing it down (switch is now down).  Now, the limits are 
ready to be set.  To set the “up” limit, carefully raise the curtain to the desired up position or before the curtain comes in contact with the 
overhead structure or hardware, then simply depress the switch (switch is now up) that controls the “up” direction of travel.  To set the 
“down” limit, lower the curtain until the curtain is completely down (batten tube slots are vertical), then depress the switch (switch is now 
up) that controls the “down” direction of travel.  The limits are now set.  Reinstall the limit switch protective cover. 

 

BELT ROUTES ABOVE
FIRST SPACER

S

O

M

F

Y

BELT ROUTES BETWEEN

THE TWO SPACERS

BELT WRAPS FROM

TOP OF HUB WITH
2 TO 3 DEAD WRAPS

BELT ROUTES UNDER

PRIMARY ROLLER AND

UP (BETWEEN PRIMARY

& SECONDARY ROLLERS)

BELT TO ROUTE DIRECTLY

UP TO TIE-OFF POINT

BELT DIRECTION

(CURTAIN UP)

Summary of Contents for Center-Roll 2081

Page 1: ...ASIUM DIVIDER CURTAIN No 2081 Wall Guide Center Roll No 2082 Torque Arm Center Roll Single Motor Operation Typical Details INST 00316 030 2000 PORTER ATHLETIC EQUIPMENT COMPANY ALL RIGHTS RESERVED 3 1...

Page 2: ...whichever shall occur first or otherwise documented and signed by an officer of Porter Athletic Equipment Company NAME OF PROJECT NAME OF DEALER NAME OF INSTALLATION COMPANY PHONE PHONE Porter Order N...

Page 3: ...PORT TUBE ASSEMBLY 7 8 TORQUE DRIVE INSTALLATION 8 9 10 WALL GUIDE TRACK INSTALLATION 10 11 HOISTING AND ANCHORING THE CURTAIN 11 12 CORD REEL MOUNTING 12 13 TORQUE ARM BELT TIE OFF 13 CORD REEL ELECT...

Page 4: ...ly depending upon the nature of the equipment and its use When the equipment is exposed to heavy use special inspections should be made in addition to the normal maintenance program At minimum a yearl...

Page 5: ...Again the safest equipment can be damaged when used by untrained personnel It is imperative the procedures and guidelines set forth in this manual are strictly observed TOOLS REQUIRED POP RIVET GUN E...

Page 6: ...e Tube Inserted Connecting Batten Tubes at Splice Location FIGURE A 4 BATTEN TUBE INSPECTION Inspect batten tube cable slots for metal shavings that may have accumulated in the batten tube cable slot...

Page 7: ...cord slot See Figure B Continue pulling the panel completely into through the cord slot until the curtain panel edge is near the opposite end of the batten tube Refer to the installation drawing for e...

Page 8: ...the weighted end section The weighted end section must be positioned at the motor end for torque arm installations and opposite end of the motor for wall guide installations In addition the weighted...

Page 9: ...low Now with the machined crown grooves rotated and aligned with the batten tube keys insert the torque motor fully until the machined crown s flange is tight against the end of the batten tube To sec...

Page 10: ...actory completely assembled ready to install into the batten tube with the exception of the torque arm strap The strap is not routed through the spacers and not dead wrapped on the torque arm drum at...

Page 11: ...AIN Depending on anchoring conditions it may be necessary to install supplemental support hardware to existing structure prior to raising the curtain Refer to the installation drawing for details The...

Page 12: ...ditions allow the optimum mounting height for the power reel assembly is above the plane of the curtain upper support tube but not more than 32 0 above the curtain batten tube Mounting brackets and ha...

Page 13: ...the outer flange of the assembly with the cord wound on the drum rotate the reel and cord together no more than two 2 revolutions in a clockwise direction Now without releasing the tension pull the r...

Page 14: ...d position See Figure H Refer to the specific counter torque style for the operational test procedure Caution Until the torque motor limits are set caution must be exercised when operating the curtain...

Page 15: ...omplished by performing the following test Remove the limit switch protective cover Depress one switch and release it switch is now up Turn the key switch key in one direction If the curtain does not...

Page 16: ...pon the usage of the unit it is recommended that at least an annual inspection be made at which time the following steps should be taken 1 GENERAL Make certain the Porter key switch is not substituted...

Page 17: ...event damage to the curtain fabric 8 CURTAIN FABRIC Inspect the curtain for tears or holes in the fabric Additional fabric can be supplied for patching purposes Industrial vinyl cement can be used to...

Page 18: ...18 WIRING AT WINCH IMPORTANT NOTE WIRING AT WALL MOUNTED KEY SWITCH IMPORTANT NOTE CAUTION SUBSTITUTION X Y...

Page 19: ...MUM LENGTH 70 0 OR 1600 SQ FT CENTER ROLL GYMNASIUM DIVIDER CURTAIN MAXIMUM 70 0 LENGTH OR 1600 SQ FT CENTER ROLL GYMNASIUM DIVIDER CURTAIN SEE SHEET C 2081 1 FOR INSTALLATION OPTIONS 92081 ___ WALL G...

Page 20: ...ORQUE ARM OPERATED SEE SHEET C 2082 1 FOR INSTALLATION OPTIONS CENTER ROLL GYMNASIUM DIVIDER CURTAIN MAXIMUM LENGTH 70 0 OR 1600 SQ FT CENTER ROLL GYMNASIUM DIVIDER CURTAIN C 2082 MAXIMUM 70 0 LENGTH...

Page 21: ...21 INSTALLER NOTES...

Page 22: ...22 INSTALLER NOTES...

Page 23: ...23 INSTALLER NOTES...

Page 24: ...LER NOTES Porter Athletic Equipment Company 2500 South 25th Avenue Broadview IL U S A 60155 Toll Free 800 947 6783 Phone 708 338 2000 Fax 708 338 2060 www porter ath com SAVE THESE INSTRUCTIONS FOR FU...

Reviews: