Porter Center-Roll 2081 Installation, Operation & Maintenance Manual Download Page 4

 

4

MODEL No. 2080 CENTER-ROLL

®

 DIVIDER CURTAIN 

 
 

MANUAL OVERVIEW 

 
 

WARNING!  DO NOT ATTEMPT TO OPERATE THIS UNIT 

WITHOUT REVIEWING THE OPERATIONAL INSTRUCTIONS

 

 
 
 

This manual has been prepared to assist you with the installation, operation and maintenance of the Model No. 2080 Center-Roll

®

 divider 

curtain.  Enclosed in this manual is a maintenance inspection list for your equipment, including operational information.  We recommend that 
you read this manual to become familiar with the operation of the 2080 Center-Roll

®

, and then assign it to the person responsible for the 

maintenance and inspection program.  If you require additional copies of this manual, please call Porter Athletic Equipment Co. 
 
 

The safest equipment can be damaged when used by the untrained.  We suggest that qualified personnel supervise all utilized equipment.  

Refer to the operational instructions for further information concerning use of equipment.  For ease of administering this maintenance program, 
we suggest that your equipment be numbered and a file maintained of its location, name of manufacturer, original item number, date of 
purchase, and maintenance performed.  This will be useful when ordering replacement parts and keeping track of maintenance.  Defective 
equipment should be marked 

“DO NOT USE”

 until replacement or repairs are completed. 

 
 

Inspections should be performed periodically, depending upon the nature of the equipment and its use.  When the equipment is exposed to 

heavy use, special inspections should be made in addition to the normal maintenance program.  At minimum, a yearly inspection of the system 
is recommended.  Any structural and/or electrical deviation from the porter installation manuals and drawings, without written authorization, 
will void all warranties. 
 
 
 

 
 
 
 
 

MODEL No. 2080 CENTER-ROLL

®

 DIVIDER CURTAIN

 

 
 

OPERATIONAL INSTRUCTIONS 

 
 

WARNING!

 

 
 
 

The Model No. 2080 Center-Roll

®

 divider curtain is powered by a 110-volt electric torque motor assembly, which develops tremendous 

forces.  This equipment is only to be operated by qualified personnel to avoid structural damage or possible injury to the operator and other 
individuals in the gymnasium. 
 
 

Caution should be exercised at all times for safety reasons, keeping the following guidelines in mind. 

 
1.

 

ONLY

 authorized, 

TRAINED

 personnel are to operate the Model No. 2080 Center-Roll

®

 divider curtain.  Authorized personnel is defined 

as an individual (or individuals) who is at least 21 years of age, has witnessed the proper operation of the unit, and is sanctioned by the 
facility as being responsible for the operation of the divider curtain. 

 
2.

 

The key switch which controls the divider curtain, must be flush mounted on the wall in a location which is in full view of the divider 
curtain, and not directly beneath the equipment.  

 
3.

 

Always make sure the area below the divider curtain and in the path of travel is clear of all individuals or obstacles when raising or 
lowering the unit 

 

Summary of Contents for Center-Roll 2081

Page 1: ...ASIUM DIVIDER CURTAIN No 2081 Wall Guide Center Roll No 2082 Torque Arm Center Roll Single Motor Operation Typical Details INST 00316 030 2000 PORTER ATHLETIC EQUIPMENT COMPANY ALL RIGHTS RESERVED 3 1...

Page 2: ...whichever shall occur first or otherwise documented and signed by an officer of Porter Athletic Equipment Company NAME OF PROJECT NAME OF DEALER NAME OF INSTALLATION COMPANY PHONE PHONE Porter Order N...

Page 3: ...PORT TUBE ASSEMBLY 7 8 TORQUE DRIVE INSTALLATION 8 9 10 WALL GUIDE TRACK INSTALLATION 10 11 HOISTING AND ANCHORING THE CURTAIN 11 12 CORD REEL MOUNTING 12 13 TORQUE ARM BELT TIE OFF 13 CORD REEL ELECT...

Page 4: ...ly depending upon the nature of the equipment and its use When the equipment is exposed to heavy use special inspections should be made in addition to the normal maintenance program At minimum a yearl...

Page 5: ...Again the safest equipment can be damaged when used by untrained personnel It is imperative the procedures and guidelines set forth in this manual are strictly observed TOOLS REQUIRED POP RIVET GUN E...

Page 6: ...e Tube Inserted Connecting Batten Tubes at Splice Location FIGURE A 4 BATTEN TUBE INSPECTION Inspect batten tube cable slots for metal shavings that may have accumulated in the batten tube cable slot...

Page 7: ...cord slot See Figure B Continue pulling the panel completely into through the cord slot until the curtain panel edge is near the opposite end of the batten tube Refer to the installation drawing for e...

Page 8: ...the weighted end section The weighted end section must be positioned at the motor end for torque arm installations and opposite end of the motor for wall guide installations In addition the weighted...

Page 9: ...low Now with the machined crown grooves rotated and aligned with the batten tube keys insert the torque motor fully until the machined crown s flange is tight against the end of the batten tube To sec...

Page 10: ...actory completely assembled ready to install into the batten tube with the exception of the torque arm strap The strap is not routed through the spacers and not dead wrapped on the torque arm drum at...

Page 11: ...AIN Depending on anchoring conditions it may be necessary to install supplemental support hardware to existing structure prior to raising the curtain Refer to the installation drawing for details The...

Page 12: ...ditions allow the optimum mounting height for the power reel assembly is above the plane of the curtain upper support tube but not more than 32 0 above the curtain batten tube Mounting brackets and ha...

Page 13: ...the outer flange of the assembly with the cord wound on the drum rotate the reel and cord together no more than two 2 revolutions in a clockwise direction Now without releasing the tension pull the r...

Page 14: ...d position See Figure H Refer to the specific counter torque style for the operational test procedure Caution Until the torque motor limits are set caution must be exercised when operating the curtain...

Page 15: ...omplished by performing the following test Remove the limit switch protective cover Depress one switch and release it switch is now up Turn the key switch key in one direction If the curtain does not...

Page 16: ...pon the usage of the unit it is recommended that at least an annual inspection be made at which time the following steps should be taken 1 GENERAL Make certain the Porter key switch is not substituted...

Page 17: ...event damage to the curtain fabric 8 CURTAIN FABRIC Inspect the curtain for tears or holes in the fabric Additional fabric can be supplied for patching purposes Industrial vinyl cement can be used to...

Page 18: ...18 WIRING AT WINCH IMPORTANT NOTE WIRING AT WALL MOUNTED KEY SWITCH IMPORTANT NOTE CAUTION SUBSTITUTION X Y...

Page 19: ...MUM LENGTH 70 0 OR 1600 SQ FT CENTER ROLL GYMNASIUM DIVIDER CURTAIN MAXIMUM 70 0 LENGTH OR 1600 SQ FT CENTER ROLL GYMNASIUM DIVIDER CURTAIN SEE SHEET C 2081 1 FOR INSTALLATION OPTIONS 92081 ___ WALL G...

Page 20: ...ORQUE ARM OPERATED SEE SHEET C 2082 1 FOR INSTALLATION OPTIONS CENTER ROLL GYMNASIUM DIVIDER CURTAIN MAXIMUM LENGTH 70 0 OR 1600 SQ FT CENTER ROLL GYMNASIUM DIVIDER CURTAIN C 2082 MAXIMUM 70 0 LENGTH...

Page 21: ...21 INSTALLER NOTES...

Page 22: ...22 INSTALLER NOTES...

Page 23: ...23 INSTALLER NOTES...

Page 24: ...LER NOTES Porter Athletic Equipment Company 2500 South 25th Avenue Broadview IL U S A 60155 Toll Free 800 947 6783 Phone 708 338 2000 Fax 708 338 2060 www porter ath com SAVE THESE INSTRUCTIONS FOR FU...

Reviews: