CENTER-ROLL

®

 BATTEN TUBE 

 

All splice locations and rivet fasteners are to be inspected for structural integrity.  Ensure the splices are tight with no noticeable free play 
between the batten tubes.  Inspect each splice rivet for a tight secure connection and for flush fit with batten tube.  In addition, carefully 
inspect the rivets securing the motor drive to the batten tube, also checking that the rivets are tight with no free play or protrusions. 

 

7.

 

UPPER AND LOWER CURTAIN SUPPORT TUBES 

 

Inspect both upper and lower support tubes (inside curtain pockets), ensuring that the tubes are in line and not separating at the splice 
locations.  Ensure that the lower support tube is secured to the bottom pocket at each end.  Make sure the screws are in place and that the 
tube is approximately flush with the fabric edge at each end.  A pipe cap should also be in place at each end of the lower support tube to 
prevent damage to the curtain fabric. 

 

8.

 

CURTAIN FABRIC 

 

Inspect the curtain for tears or holes in the fabric. Additional fabric can be supplied for patching purposes.  Industrial vinyl cement can be 
used to bond the patches to the curtain.  Also, check the fabric for signs of tearing or separation at the heat-sealed seams.  With each fabric 
panel, ensure the cable is fully inserted in the pocket, and that the cable ends are not overhanging from batten tube.  The fabric panels 
should never overhang from the batten tube ends.  The fabric panels should always be flush or inside the batten tube ends. 

 

9.

 

CONTRACT MAINTENANCE ALTERNATIVE 

 

In many facilities, it is possible that the maintenance personnel either do not have the ability or the scaffold to work at the heights required 
to perform the inspection and maintenance program outlined in this manual.  Should your maintenance program be so limited that this 
program cannot be properly performed, it is highly recommended that a contract type inspection/ maintenance service program be initiated 
with a qualified and trained establishment in this type of equipment. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Center-Roll 2081

Page 1: ...ASIUM DIVIDER CURTAIN No 2081 Wall Guide Center Roll No 2082 Torque Arm Center Roll Single Motor Operation Typical Details INST 00316 030 2000 PORTER ATHLETIC EQUIPMENT COMPANY ALL RIGHTS RESERVED 3 1...

Page 2: ...whichever shall occur first or otherwise documented and signed by an officer of Porter Athletic Equipment Company NAME OF PROJECT NAME OF DEALER NAME OF INSTALLATION COMPANY PHONE PHONE Porter Order N...

Page 3: ...PORT TUBE ASSEMBLY 7 8 TORQUE DRIVE INSTALLATION 8 9 10 WALL GUIDE TRACK INSTALLATION 10 11 HOISTING AND ANCHORING THE CURTAIN 11 12 CORD REEL MOUNTING 12 13 TORQUE ARM BELT TIE OFF 13 CORD REEL ELECT...

Page 4: ...ly depending upon the nature of the equipment and its use When the equipment is exposed to heavy use special inspections should be made in addition to the normal maintenance program At minimum a yearl...

Page 5: ...Again the safest equipment can be damaged when used by untrained personnel It is imperative the procedures and guidelines set forth in this manual are strictly observed TOOLS REQUIRED POP RIVET GUN E...

Page 6: ...e Tube Inserted Connecting Batten Tubes at Splice Location FIGURE A 4 BATTEN TUBE INSPECTION Inspect batten tube cable slots for metal shavings that may have accumulated in the batten tube cable slot...

Page 7: ...cord slot See Figure B Continue pulling the panel completely into through the cord slot until the curtain panel edge is near the opposite end of the batten tube Refer to the installation drawing for e...

Page 8: ...the weighted end section The weighted end section must be positioned at the motor end for torque arm installations and opposite end of the motor for wall guide installations In addition the weighted...

Page 9: ...low Now with the machined crown grooves rotated and aligned with the batten tube keys insert the torque motor fully until the machined crown s flange is tight against the end of the batten tube To sec...

Page 10: ...actory completely assembled ready to install into the batten tube with the exception of the torque arm strap The strap is not routed through the spacers and not dead wrapped on the torque arm drum at...

Page 11: ...AIN Depending on anchoring conditions it may be necessary to install supplemental support hardware to existing structure prior to raising the curtain Refer to the installation drawing for details The...

Page 12: ...ditions allow the optimum mounting height for the power reel assembly is above the plane of the curtain upper support tube but not more than 32 0 above the curtain batten tube Mounting brackets and ha...

Page 13: ...the outer flange of the assembly with the cord wound on the drum rotate the reel and cord together no more than two 2 revolutions in a clockwise direction Now without releasing the tension pull the r...

Page 14: ...d position See Figure H Refer to the specific counter torque style for the operational test procedure Caution Until the torque motor limits are set caution must be exercised when operating the curtain...

Page 15: ...omplished by performing the following test Remove the limit switch protective cover Depress one switch and release it switch is now up Turn the key switch key in one direction If the curtain does not...

Page 16: ...pon the usage of the unit it is recommended that at least an annual inspection be made at which time the following steps should be taken 1 GENERAL Make certain the Porter key switch is not substituted...

Page 17: ...event damage to the curtain fabric 8 CURTAIN FABRIC Inspect the curtain for tears or holes in the fabric Additional fabric can be supplied for patching purposes Industrial vinyl cement can be used to...

Page 18: ...18 WIRING AT WINCH IMPORTANT NOTE WIRING AT WALL MOUNTED KEY SWITCH IMPORTANT NOTE CAUTION SUBSTITUTION X Y...

Page 19: ...MUM LENGTH 70 0 OR 1600 SQ FT CENTER ROLL GYMNASIUM DIVIDER CURTAIN MAXIMUM 70 0 LENGTH OR 1600 SQ FT CENTER ROLL GYMNASIUM DIVIDER CURTAIN SEE SHEET C 2081 1 FOR INSTALLATION OPTIONS 92081 ___ WALL G...

Page 20: ...ORQUE ARM OPERATED SEE SHEET C 2082 1 FOR INSTALLATION OPTIONS CENTER ROLL GYMNASIUM DIVIDER CURTAIN MAXIMUM LENGTH 70 0 OR 1600 SQ FT CENTER ROLL GYMNASIUM DIVIDER CURTAIN C 2082 MAXIMUM 70 0 LENGTH...

Page 21: ...21 INSTALLER NOTES...

Page 22: ...22 INSTALLER NOTES...

Page 23: ...23 INSTALLER NOTES...

Page 24: ...LER NOTES Porter Athletic Equipment Company 2500 South 25th Avenue Broadview IL U S A 60155 Toll Free 800 947 6783 Phone 708 338 2000 Fax 708 338 2060 www porter ath com SAVE THESE INSTRUCTIONS FOR FU...

Reviews: