background image

INSTALLATION

GUIDE

SET THE DIP SWITCHES 

ON THE ADJUSTMENT BOARD

§

Set the 

dip switches

according to the application. 

SW2

WWW.PORTALP.COM

|

26

Automatic Doors & Building Access Control

SW10

(Full Power) & S

W19 

(Low Energy)

Summary of Contents for SW10

Page 1: ...DE SW10 19 AUTOMATED PEDESTRIAN SWINGING DOOR OPERATOR SW10 Full Power SW19 Low Energy IG SW10 19 JUN 23 2022 USA A COPYRIGHT 2022 PORTALP USA INC Automatic Doors Building Access Control PORTALP USA Inc www portalp com ...

Page 2: ...es tiers ni copiée sous tout format et avec tout moyen qu il soit électronique mécanique ou par photocopie sans le consentement écrit préalable de PORTALP USA Inc Tous les noms et les marques cités sont la propriété de leurs fabricants respectifs Les clients peuvent faire des copies pour leur usage exclusif Ce manuel a été publié en 2020 PORTALP USA Inc 11075 Parker Drive Irwin PA 15642 Tel 412 82...

Page 3: ...MENT BOARD WIRING CONNECTIONS ADJUSTING THE MECHANICAL DOORSTOP TROUBLESHOOTING JOB DOCUMENTATION CLOSEOUT ACCESSORIES CUSTOMER SERVICE Automatic Doors Building Access Control 04 05 06 07 13 14 17 18 20 21 22 23 24 25 26 27 28 29 30 31 31 31 APPENDIX BOX CONTENT APPENDIX WIRING DIAGRAMS APPENDIX ELECTRIC LOCK APPLICATION APPENDIX SW10 PAIR WITH THE BAT TORPEDO BEA BODUGUARD APPENDIX SW10 SINGLE PA...

Page 4: ...ccording to national performance standards or recommended performance guidelines as defined by PORTALP repairs should be made immediately If an immediate repair cannot be made the product should be disabled and appropriate measures should be taken to secure the door in a safe position or to enable the door to safely be used manually During this situation every effort should be made to notify the o...

Page 5: ...ion définies par PORTALP il faudra procéder aux réparations nécessaires dans les plus brefs délais Si une réparation immédiate ne peut se faire le produit doit être désactivé et des mesures appropriées doivent être prises afin de sécuriser la porte ou de permettre à celle ci de pouvoir être utilisée manuellement en toute securité Dans tel cas tous les efforts devront être entrepris afin de signale...

Page 6: ...rior Activation Exterior Activation Emergency Shutdown Alarm Output Stop Safety Device door mounted Safety Device Input Secondary Activation Quick Disconnects TAP Controller optional This product should only be connected to an electrical installation that complies with the regulations The installer must ensure that the temperature range marked on the nameplate is well suited to the site Before any...

Page 7: ...1 5 Refer to the APPENDIX for fire rated door applications PUSH ARM APPLICATIONS Bottom of swing unit is flush with bottom of top door frame NOTE PORTALP is now using a 35mm spindle adaptor for all standard push arm applications this requires that the header assembly be mounted as shown at left flush with bottom of top door frame PULL ARM APPLICATION STANDARD PULL ARM DOUBLE EGRESS APPLICATIONS Do...

Page 8: ...TALLATION PUSH SIDE INSTALLATION SINGLE DOOR PREP DRAWINGS Opening Width Operator Width X Dim 36 39 6 25 42 45 12 25 44 47 14 25 48 51 18 25 WWW PORTALP COM 8 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 9: ...g Width Operator Width A Dim C Dim 72 75 12 7 16 N A 84 87 N A 10 7 8 88 91 N A 14 7 8 96 99 24 7 16 22 7 8 PUSH SIDE INSTALLATION DOUBLE DOOR PREP DRAWINGS WWW PORTALP COM 9 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 10: ...TALLATION PULL SIDE INSTALLATION SINGLE DOOR PREP DRAWINGS Opening Width Operator Width Y Dim 36 39 6 25 42 45 12 25 44 47 14 25 48 51 18 25 WWW PORTALP COM 10 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 11: ...IDE INSTALLATION DOUBLE DOOR PREP DRAWINGS Opening Width Operator Width A Dim C Dim 72 75 12 7 16 N A 84 87 N A 10 7 8 88 91 N A 14 7 8 96 99 24 7 16 22 7 8 WWW PORTALP COM 11 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 12: ...E EGRESS INSTALLATION DOOR PREP DRAWINGS Opening Width Operator Width A Dim C Dim 72 75 12 7 16 N A 84 87 N A 10 7 8 88 91 N A 14 7 8 96 99 24 7 16 22 7 8 WWW PORTALP COM 12 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 13: ...INSTALLATION GUIDE HEADER INSTALLATION DOUBLE EGRESS PULL ARM DOUBLE EGRESS PUSH ARM WWW PORTALP COM 13 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy 4 875 4 875 ...

Page 14: ...n The keyhole allows for easy removal of the drive plate without the need to loosen the screw Removing the four 4 screws allows the drive plate operator to be removed from the header and rotated 180 degrees to change from a push to a pull or vice versa Drive Plate mounted in standard position using four 4 screws to secure Loosen the screws using a 5 mm allen wrench and slide each one off the drive...

Page 15: ... Control SW10 Full Power SW19 Low Energy For pull application the motor should be located near the hinge side of the door For push application the I O board should be located near the hinge side of the door Re align locating screw to key slot insert drive plate and shift to the right into position Re position the four 4 screws to secure the drive plate ...

Page 16: ...ON GUIDE MOUNT THE OPERATOR S PUSH I O BOARD IS TOWARDS THE HINGE JAMB OPERATOR OPERATOR RH PUSH LH PUSH I O BOARD MOTOR WWW PORTALP COM 16 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 17: ...ATOR OPERATOR PULL ROUND MOTOR IS TOWARDS THE HINGE Mount the header to the doorframe with the screws provided The header will overlap the doorframe by 1 1 2 at each side WWW PORTALP COM 17 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 18: ...d towards the closing direction as shown If more spring tension is desired simply increase the mounting angle to greater than 20 degrees so it results in increased preload BOX CONTENT Page 33 35 BOX CONTENT Page 33 35 WWW PORTALP COM 18 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy INCLUDED WITH DOUBLE EGRESS ARM INCLUDED WITH PUSH ARM INCLUDED WITH DOUBLE EGRESS ARM ...

Page 19: ... of the hole at the door shoe and the center of the hole at the pivot point of the primary arm as shown Mark a pencil line at the edge of the sleeve where it overlaps the short arm that is connected to the primary arm This will make it easier when positioning the primary arm for final installation Reveal Hinge Hung X Dim Center Pivot X Dim 0 13 16 1 14 17 2 15 18 3 16 19 4 17 20 5 18 21 6 19 7 20 ...

Page 20: ...ION Rotate the primary arm in the opening direction as to reach the pivot point of the secondary Attach the arms together with the hardware provided WWW PORTALP COM 20 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 21: ...the fully open position Power the door to the open position through the use of the hold open switch on the side of the header It may be necessary to first execute a setup on the operator prior to doing this Refer to the applicable section within this User s Guide for proper instruction Once the operator is rotated to the fully open position manually move the door to the desired fully open position...

Page 22: ...all incoming electrical power is shut off before proceeding with any wiring to SW10 19 Use only with wire harness provided failure to do so may result in damage to equipment or personal harm as well as voiding the warranty AVERTISSEMENT assurez vous que toute alimentation électrique entrante est coupée avant de procéder au câblage du SW10 19 À utiliser uniquement avec le faisceau de câbles fourni ...

Page 23: ...ment Momentarily press on SW1 to acknowledge the change and extinguish the yellow LED HELPFUL NOTES Speed and time adjustment changes will not take effect until the door closes fully after the adjustment has been made Hold Open time affects the delay following activation from input 10 11 and 13 When Dip Switch 5 is ON the blue speed and time potentiometers are disabled and will have no effect DL1 ...

Page 24: ...the Setup activate the door to open and ensure all performance is acceptable Adjust opening and closing speed as necessary If speeds are changed a re learn is not required A re learn is not required following a main power recovery Adjust hold open time as required Additional adjustments are available through the TAP B1 Battery use CR1216 battery required to maintain timer settings and date program...

Page 25: ...lication Dip switches are used to apply specific functions to the control There are 3 sets of dip switches TWO 2 POSITION on the I O board DS1 DS2 and a 10 position at the adjustment board SW2 DS2 DS1 NOT USED WWW PORTALP COM 25 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 26: ...TALLATION GUIDE SET THE DIP SWITCHES ON THE ADJUSTMENT BOARD Set the dip switches according to the application SW2 WWW PORTALP COM 26 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 27: ...be adjusted for full power or low energy operation via potentiometers Default 6 Lockout Function Overhead presence sensor input 17 is inhibited during closing cycle unless input 14 is triggered Connect COM and Input 14 to NC output of lockout safety beam Disabled Overhead presence sensor input 17 is inhibited during closing cycle Otherwise if commanded it keeps an open door open and a closed door ...

Page 28: ...vate when dip switch 3 is ON AND On Off switch is OFF 11 External Activation Requires N O Contact between input 11 COM 12 Emergency Closing Requires N C contact between 12 COM Upon open contact door closes and overrides all other inputs Remains jumpered if input is not used 13 Secondary Activation Requires N C contact between 13 COM Disabled in full closed position 14 Stall Safety Requires N C con...

Page 29: ...stops are located on the top or bottom of the operator depending on the hand of the door Apply 120 VAC Main power to the control o Place the On Off Hold switch to the Hold Open position OPEN ROTATION STOP POINT SCREW MOVES WITH OPERATOR ROTATION CLOSED DOOR STOP OPEN DOOR STOP WWW PORTALP COM 29 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy ...

Page 30: ... Indicates a potential faulty setup o Loose or incorrect motor connection o Possible loose chain tensioner refer to Appendix for chain tensioner adjustment procedures o Launch a new setup If problem repeats and there are no other discrepancies noted replace the operator control sub assembly Door closes too fast at last 5 to 10 degrees of closing Ensure dip switch 8 is OFF Ensure there is no bindin...

Page 31: ...ally advise the Owner of the work that was performed and ask if there are any other doors that may require service ACCESSORIES The BAT Microwave Motion Sensor PN 200 1068 The TORPEDO door mounted presence sensor PN 200 1087 Spindle Adaptors 20 35 50 80 mm TAP Controller KP EVO ADDITIONAL PROGRAMMING TROUBLE SHOOTING TOOLS CUSTOMER SERVICE WWW PORTALP COM 31 Automatic Doors Building Access Control ...

Page 32: ...BAG 3 Wire Connectors 1 E PORTALP Logo Plate 1 F Installation Guide 1 G Jump Start 1 H MCI Most Common Issues 1 I WARNING PLATE 1 J ARROW LABEL 1 K CAUTION LABEL 1 L HANDICAP LABEL 2 M PUSH ARM CA 1 OPERATOR SINGLE PUSH ARM CA Clear Anodized WWW PORTALP COM 32 Automatic Doors Building Access Control SW10 Full Power SW19 Low Energy G F C D J K L H I E ...

Page 33: ... QTY 1 SW10 Spindle 35mm QTY 2 nut QTY 2 M5x14mm Socket Cap Screw QTY 1 M8 X 35 Socket Cap Screw Zinc QTY 1 Countersunk Finishing Washer QTY 1 Flat Head M6x16 QTY 1 Circlip 7mm QTY 2 12 11 x 1 Pan Head Philips Sheet Metal Screw PLASTIC BAG CONTENT QTY 1 QTY 1 Plastic Bag WWW PORTALP COM 33 Automatic Doors Building Access Control TUCKER SW10 Full Power SW19 Low Energy ...

Page 34: ...SW10 Full Power SW19 Low Energy CONTENT DESCRIPTION QTY A HEADER OPERATOR BOX 1 B HEADER OPERATOR DB 1 C HEADER BAG 6 Screws 1 D HEADER BAG 3 Wire Connectors 1 E PORTALP Logo Plate 1 F Installation Guide 1 G Jump Start 1 H MCI Most Common Issues 1 I WARNING PLATE 1 J ARROW LABEL 1 K CAUTION LABEL 1 L HANDICAP LABEL 2 M PUSH ARM DB 1 G F C D H E J K L I ...

Page 35: ...TY 1 SW10 Spindle 35mm QTY 2 nut QTY 2 M5x14mm Socket Cap Screw QTY 1 M8 X 35 Socket Cap Screw Zinc QTY 1 Countersunk Finishing Washer QTY 1 Flat Head M6x16 QTY 1 Circlip 7mm QTY 2 12 11 x 1 Pan Head Philips Sheet Metal Screw QTY 1 Plastic Bag PLASTIC BAG CONTENT QTY 1 WWW PORTALP COM 35 Automatic Doors Building Access Control TUCKER SW10 Full Power SW19 Low Energy ...

Page 36: ...10 Full Power SW19 Low Energy G F C D J K L H I E CONTENT DESCRIPTION QTY A HEADER OPERATOR BOX 1 B HEADER OPERATOR CA 1 C HEADER BAG 6 Screws 1 D HEADER BAG 3 Wire Connectors 1 E PORTALP Logo Plate 1 F Installation Guide 1 G Jump Start 1 H MCI Most Common Issues 1 I WARNING PLATE 1 J ARROW LABEL 1 K CAUTION LABEL 1 L HANDICAP LABEL 2 M PULL ARM CA 1 ...

Page 37: ...Head QTY 1 M6 Slide In T Nut QTY 1 Door Arm Channel Endcap QTY 1 Plastic Bag PLASTIC BAG CONTENT QTY 2 12 11 x 1 Pan Head Philips Sheet Metal Screw QTY 2 nut QTY 1 Circlip 7mm QTY 2 M5x14mm Socket Cap Screw QTY 1 M8 X 35 Socket Cap Screw Zinc PULL ARM CA Clear Anodized WWW PORTALP COM 37 Automatic Doors Building Access Control TUCKER SW10 Full Power SW19 Low Energy ...

Page 38: ...SW10 Full Power SW19 Low Energy CONTENT DESCRIPTION QTY A HEADER OPERATOR BOX 1 B HEADER OPERATOR DB 1 C HEADER BAG 6 Screws 1 D HEADER BAG 3 Wire Connectors 1 E PORTALP Logo Plate 1 F Installation Guide 1 G Jump Start 1 H MCI Most Common Issues 1 I WARNING PLATE 1 J ARROW LABEL 1 K CAUTION LABEL 1 L HANDICAP LABEL 2 M PULL ARM DB 1 G F C D J K L H I E ...

Page 39: ... Head QTY 1 M6 Slide In T Nut QTY 1 Door Arm Channel Endcap QTY 1 Plastic Bag PLASTIC BAG CONTENT QTY 2 12 11 x 1 Pan Head Philips Sheet Metal Screw QTY 2 nut QTY 1 Circlip 7mm QTY 2 M5x14mm Socket Cap Screw QTY 1 M8 X 35 Socket Cap Screw Zinc PULL ARM DB Dark Bronze WWW PORTALP COM 39 Automatic Doors Building Access Control TUCKER SW10 Full Power SW19 Low Energy ...

Page 40: ...Full Power SW19 Low Energy A G F C D H E CONTENT DESCRIPTION QTY A HEADER OPERATOR BOX 1 B DOUBLE HEADER OPERATOR CA 1 C HEADER BAG 6 Screws 1 D HEADER BAG 3 Wire Connectors 1 E PORTALP Logo Plate 1 F Installation Guide 1 G Jump Start 1 H MCI Most Common Issues 1 I WARNING PLATE 1 J ARROW LABEL 2 K CAUTION LABEL 2 L HANDICAP LABEL 4 M PULL ARM CA 2 J K L I ...

Page 41: ...Head QTY 1 M6 Slide In T Nut QTY 1 Door Arm Channel Endcap QTY 1 Plastic Bag PLASTIC BAG CONTENT QTY 2 12 11 x 1 Pan Head Philips Sheet Metal Screw QTY 2 nut QTY 1 Circlip 7mm QTY 2 M5x14mm Socket Cap Screw QTY 1 M8 X 35 Socket Cap Screw Zinc PULL ARM CA Clear Anodized WWW PORTALP COM 41 Automatic Doors Building Access Control TUCKER SW10 Full Power SW19 Low Energy ...

Page 42: ...Head QTY 1 M6 Slide In T Nut QTY 1 Door Arm Channel Endcap QTY 1 Plastic Bag PLASTIC BAG CONTENT QTY 2 12 11 x 1 Pan Head Philips Sheet Metal Screw QTY 2 nut QTY 1 Circlip 7mm QTY 2 M5x14mm Socket Cap Screw QTY 1 M8 X 35 Socket Cap Screw Zinc PULL ARM CA Clear Anodized WWW PORTALP COM 42 Automatic Doors Building Access Control TUCKER SW10 Full Power SW19 Low Energy ...

Page 43: ... Power SW19 Low Energy A G F C D H E CONTENT DESCRIPTION QTY A HEADER OPERATOR BOX 1 B DOUBLE HEADER OPERATOR DB 1 C HEADER BAG 6 Screws 1 D HEADER BAG 3 Wire Connectors 1 E PORTALP Logo Plate 1 F Installation Guide 1 G Jump Start 1 H MCI Most Common Issues 1 I WARNING PLATE 1 J ARROW LABEL 2 K CAUTION LABEL 2 L HANDICAP LABEL 4 M PULL ARM DB 2 J K L I M ...

Page 44: ... Head QTY 1 M6 Slide In T Nut QTY 1 Door Arm Channel Endcap QTY 1 Plastic Bag PLASTIC BAG CONTENT QTY 2 12 11 x 1 Pan Head Philips Sheet Metal Screw QTY 2 nut QTY 1 Circlip 7mm QTY 2 M5x14mm Socket Cap Screw QTY 1 M8 X 35 Socket Cap Screw Zinc PULL ARM DB Dark Bronze WWW PORTALP COM 44 Automatic Doors Building Access Control TUCKER SW10 Full Power SW19 Low Energy ...

Page 45: ... Head QTY 1 M6 Slide In T Nut QTY 1 Door Arm Channel Endcap QTY 1 Plastic Bag PLASTIC BAG CONTENT QTY 2 12 11 x 1 Pan Head Philips Sheet Metal Screw QTY 2 nut QTY 1 Circlip 7mm QTY 2 M5x14mm Socket Cap Screw QTY 1 M8 X 35 Socket Cap Screw Zinc PULL ARM DB Dark Bronze WWW PORTALP COM 45 Automatic Doors Building Access Control TUCKER SW10 Full Power SW19 Low Energy ...

Page 46: ...13 Door mounted sensor will cause re activation when in detection during the closing cycle Secondary activation input is disabled at the full closed door position Jumpers must be installed between terminal 8 and 12 14 if those inputs are not required for the application If they are used for the application they must be connected to a N C circuit APPENDIX WIRING DIAGRAMS WWW PORTALP COM 46 Automati...

Page 47: ... for the respective input in place of the jumper a N C switching circuit will be connected to Door 1 and a sync line will be connected to Door 2 For simultaneous pairs PORTALP provides a dual harness for the On Off Hold switch Each plug in connector for the control is wired in parallel to the On Off Hold switch located in the header end cap One switch will control both doors All control adjustment...

Page 48: ...INSTALLATION GUIDE APPENDIX ELECTRIC LOCK APPLICATION WWW PORTALP COM 48 Automatic Doors Building Access Control TUCKER SW10 Full Power SW19 Low Energy ...

Page 49: ...INSTALLATION GUIDE WWW PORTALP COM 49 TUCKER SW10 Full Power SW19 Low Energy APPENDIX SW10 PAIR WITH THE BAT TORPEDO BEA BODUGUARD Automatic Doors Building Access Control ...

Page 50: ...INSTALLATION GUIDE WWW PORTALP COM 50 TUCKER SW10 Full Power SW19 Low Energy APPENDIX SW10 SINGLE PAIR WITH THE BAT BEA LZR MICROSCAN Automatic Doors Building Access Control ...

Page 51: ...INSTALLATION GUIDE WWW PORTALP COM 51 TUCKER SW10 Full Power SW19 Low Energy APPENDIX SW10 SINGLE WITH THE BAT BEA BODUGUARD Automatic Doors Building Access Control ...

Page 52: ...e alarm condition Ensure proper procedures have been followed to allow a main power disconnect during a fire alarm condition Always check to ensure compliance to local building codes Upon job completion always perform a functional test to ensure that the door s close and latch following a power loss o Other hardware may be required to complete the installation For example for pairs of doors if an ...

Page 53: ...ü Logic Assignment For Outputs ü Opening Closing Acceleration ü Opening Closing Deceleration ü Opening Closing Strength obstruction force ü Opening Closing Strength Duration time duration for obstruction force ü Night Time Hold Open Time ü Delay On Activation up to 4 seconds ü Electric Lock Interfacing ü Master Slave Configuration ü Cycle Count Maintenance Reset ü 7 Day Programmable Timer With Day...

Reviews: