24
Table 5.5.2: Minimum Copper Wire Sizing and Ratings
AC
Solar
Enternet
Voltage Rating
600V
1000V
30V
Temp. Class
75°C
75°C
60°C
Gauge
6AWG
12AWG
Standard Ethernet cable
6. Basic Operations
6.1 Boot System
(1) Switch on the
Power
switch on the BCMS module,
wait 60 seconds until
(Usually it takes 45 seconds for the 8 battery modules to be fully started
up; the more battery modules utilized, the longer the startup process takes.
For every battery module added, it takes 3.5 seconds longer to startup.
Therefore, it takes more than 60 seconds for 12 battery packs to be fully
started up.)
the BCMS and Battery Module start normally
, and
(2) Switch on the
PV SWITCH
on the Solar Controller, and
(3) Switch on the
MAIN
switch on PCS&EMS module
.
WARNING:
Failure to follow the instructions may damage the device.
6.2 ShutDown System
(1) Switch off the
MAIN
switch on PCS module, and
(2) Switch off the
PV
switch on the Solar Controller, and
(3) Switch off the
POWER
switch on the BCMS module
.
WARNING:
Failure to follow the instructions may damage the device.
Shut down the device and switch off all the external switches from the home
electrical panel for maintenance or extended period of non-use.
Summary of Contents for iCAN NetZero
Page 1: ...iCAN NetZero User Manual Intelligent Energy System ICN1V1 0 4 ...
Page 2: ......
Page 35: ......