23
NOTE:
Set the ADD address for both NetZero PCS under split phase application.
Refer to PCS Module part of this instruction for more detail
s
.
All external ports should be equipped with switches.
The National Electric Codes (NEC), local codes, and similar standards
outline detailed requirements for safe installation of electrical equipment.
Installation must comply with specifications for wire types, conductor sizes,
electrical and thermal insulation, branch circuit protection, grounding, and
disconnect devices.
The actual connection depends on your application case. Not all the ports
are necessary to be connected.
Please set up the actual value of generator maximum power by the app.
Refer to the generator user manual for the detail information about how to
install/connect the remote control cable and how to switch the generator
into remote mode. Figures below are examples for typical generators
remote cable connection.
Figure 5.5.4: Remote Connection for Honda EU7000iS
Figure 5.5.5: Remote Connection for Honda EM7000iS, EU6500iS,
EM6500SXK1/K2, EM5000SXK2/K3, EM5000iS, EM4000SX&EM3800SX
(2) Refer to the table below for minimum copper wire sizing and ratings.
Summary of Contents for iCAN NetZero
Page 1: ...iCAN NetZero User Manual Intelligent Energy System ICN1V1 0 4 ...
Page 2: ......
Page 35: ......