![Polytec TMS-500 TopMap Pro.Surf Operating Instructions Manual Download Page 15](http://html1.mh-extra.com/html/polytec/tms-500-topmap-pro-surf/tms-500-topmap-pro-surf_operating-instructions-manual_1578105015.webp)
3-1
3 First Steps
3 First Steps
3.1
Unpacking and Inspection
INFORMATION
Components marked with an (*) are described in separate operating
instructions.
Always pay attention to these operating instructions, too.
Unpacking
The scope of supply includes the following components:
•
1 A-CAB-BAS System Cabinet
•
1 TMS-I-500 Sensor Head
•
1 TMS-W-500 Data Management System consisting of an industrial PC
with mouse and keyboard
•
1 TMS-E-500 Controller
•
1 TFT monitor with monitor cable and mains cable
•
3 Mains cables
•
1 Hardlock (dongle)
•
1 Network cable
•
1 USB 3.0 cable (approved by Polytec)
•
1 Polytec test object
•
1 Motor cable
•
1 Control cable
•
1 A-STD-P550 Stand including 4 covering plates
•
1 A-SPK-0003 Sample Positioning Kit consisting of tip-tilt unit and spacer
ring
Assembly kit:
•
2 M6 x 25 Allen screws (sensor head – stand)
•
1 M6 x 60 Allen screw (sensor head – stand)
•
4 M6 x 25 Allen screws or 1/4"-20UNCx1" with washers (stand – base
plate)
•
4 M6 x 16 Allen screws with washers (tip-tilt unit – spacer ring or XY
positioning stage)
•
4 M6 x 25 Allen screws or 1/4"-20UNCx1" (spacer ring or XY positioning
stage – base plate)