background image

 IK-E287-001GB 2 

1

 

PURPOSE

 

The

 

G

40

 

detector

 

base

 

is

 

designed

 

for

 

the

 

connection

 

of

 

40

 

model

 

range

 

detectors

 

in

 

the

 

detecting

 

lines

 

of

 

conventional

 

control

 

panels

 

or

 

4043

 

and

 

4046

 

model

 

range

 

detectors

 

in

 

the

 

detecting

 

lines

 

of

 

the

 

POLON

 

4000

 

series

 

addressable

 

control

 

panels.

 

The

 

bases

 

are

 

intended

 

for

 

connecting

 

fire

 

detection

 

line

 

wires

 

routed

 

on

 

the

 

wall

 

plaster

 

(surface

 

mounting)

 

or

 

under

 

it

 

(semi

flushed

 

mounting)

 

 

the

 

wires

 

are

 

placed

 

in

 

a

 

special

 

duct

 

of

 

max

 

height

 

at

 

10

 

mm).

 

The

 

G

40

 

detector

 

bases

 

are

 

dedicated

 

for

 

dry

 

ceiling

 

mounting.

 

In

 

order

 

to

 

install

 

the

 

G

40

 

base

 

on

 

a

 

ceiling

 

where

 

steam

 

condensation

 

occurs

 

or

 

when

 

it

 

is

 

mounted

 

on

 

horizontal

 

suspension

 

strands,

 

additional

 

PG

40

 

base

 

industrial

 

footing

 

should

 

be

 

used.

 

The

 

PG

40

 

base

 

industrial

 

footing

 

is

 

dedicated

 

for

 

connection

 

to

 

detection

 

line

 

wires

 

(the

 

wire

 

is

 

placed

 

inside

 

a

 

duct

 

of

 

max

 

external

 

diameter

 

at

 

Ø18

 

mm)

 

routed

 

on

 

the

 

plaster

 

(surface

 

mounting).

  

It

 

is

 

possible

 

to

 

utilise

 

the

 

G

40

 

base

 

as

 

a

 

suspended

 

one

 

using

 

the

 

interconnecting

 

PG

40

 

base

 

industrial

 

footing

 

equipped

 

with

 

the

 

PG7

 

sealing

 

gland

 

and

 

the

 

PSGW

 

ceiling

 

suspended

 

base.

 

The

 

suspended

 

part

 

of

 

the

 

base

 

should

 

be

 

mounted

 

on

 

a

 

4

cord

 

cable

 

of

 

2

 

x

 

2

 

x

 

0.8

 

size.

 

Both

 

the

 

PG7

 

sealing

 

gland

 

and

 

the

 

PSGW

 

ceiling

 

suspended

 

base

 

are

 

not

 

standard

 

equipment

 

of

 

the

 

base

 

and

 

should

 

be

 

ordered

 

separately.

  

In

 

the

 

case

 

of

 

the

 

G

40

 

base

 

installation

 

in

 

places

 

where

 

risk

 

it

 

can

 

be

 

endangered

 

by

 

a

 

mechanical

 

damage

 

(i.e.

 

sports

 

hall

 

 

ball

 

strike,

 

low

 

rooms

 

 

hit

 

with

 

a

 

ladder)

 

it

 

is

 

recommended

 

to

 

use

 

the

 

special

 

OZ

40

 

protection

 

cover.

 

Additionally,

 

it

 

is

 

possible

 

to

 

fix

 

the

 

P

40

 

special

 

masking

 

ring,

 

ordered

 

separately,

 

in

 

order

 

to

 

mask

 

the

 

base

 

visible

 

part.

  

Note:

  

If

 

the

 

G

40

 

base

 

in

 

mounted

 

in

 

the

 

PG

40

 

industrial

 

footing,

 

the

 

P

40

 

masking

 

ring

 

is

 

not

 

applicable.

 

 

2

 

TECHNICAL

 

SPECIFICATIONS

 

G

40

 

DETECTOR

 

BASE

 

 

Detectors

 

interoperating

 

with

 

G

40

 

base

  

 

 

40,

 

4043

 

and

 

4046

 

model

 

range

 

detectors

 

Diameter

 

of

 

detection

 

line

 

wires

  

 

 

 

Ø

 

4.5

 

÷

 

Ø

 

5.5

 

mm

 

Max

 

diameter

 

of

 

cable

 

wires

  

 

 

 

 

 

1mm

 

Mass

   

 

 

 

 

 

 

 

0.1

 

kg

 

Dimensions

 

 

 

 

 

 

 

Ø

 

107

 

mm;

 

height

 

=

 

28.5

 

mm

 

Fastening

 

holes

 

spacing

   

 

 

 

63

 

mm

   

 

PG

40

 

BASE

 

INDUSTRIAL

 

FOOTING

 

 

Interoperating

 

base

  

G

40

 

base

  

Detection

 

line

 

wire

 

diameter

 

Ø

 

4.5

 

÷

 

Ø

 

5.5

 

mm

 

Mass

 

 

0.1

 

kg

  

Dimensions

 

Ø

 

112

 

mm;

 

height

 

=

 

26

 

mm

 

Height

 

(PG

40

 

with

 

G

40)

 

43

 

mm

 

Fastening

 

holes

 

spacing

 

127

 

mm

 

Summary of Contents for G-40

Page 1: ...G 40 DETECTOR BASE PG 40 BASE INDUSTRIAL FOOTING Installation and Maintenance Manual IK E287 001GB IIIG Edition ...

Page 2: ...onal declaration of compliance No 2PI E287 2011 dated 15 12 2011 is available on request from the manufacturer Read the manual carefully before assembling and operation of the base and the base industrial footing Any nonconformity with the instructions contained in the manual may be harmful or may cause violation of the law in force POLON ALFA bears no responsibility for any damage resulting from ...

Page 3: ...ing equipped with the PG7 sealing gland and the PSGW ceiling suspended base The suspended part of the base should be mounted on a 4 cord cable of 2 x 2 x 0 8 size Both the PG7 sealing gland and the PSGW ceiling suspended base are not standard equipment of the base and should be ordered separately In the case of the G 40 base installation in places where risk it can be endangered by a mechanical da...

Page 4: ...embracing the main connector with self clamping latches to connect detection line wires and an additional connector to fix the wire screens The base may be additionally equipped with the P 40 masking ring optional The mechanical structure of the G 40 base is shown in Fig 1 and Fig 2 Fig 1 G 40 base elements main view Fig 2 G 40 detector base mechanical design ...

Page 5: ...y it is equipped with the PG7 sealing gland The mechanical structure of the PG 40 base industrial footing is shown in Fig 3a and Fig 3b assembling instructions for the suspended base are presented in Fig 4 The mechanical structure of the OZ 40 protection cover is shown in Fig 5 Fig 3a PG 40 base industrial footing mechanical design Fig 3b PG 40 base industrial footing and PG7 sealing gland main vi...

Page 6: ...IK E287 001GB 5 Fig 4 G 40 suspended base assembling Fig 5 OZ 40 protection cover ...

Page 7: ...f the base into the POLON 4000 system detection line The fig 8 shows how the bases should be installed in conventional control panel detection lines Continuity of a detection line is obtained only in the event all detectors are placed in their bases The line continuity may be achieved when the E287 04 00 jumper Fig 6 is placed into the detector connector The jumper is optional and should be ordere...

Page 8: ...h two screws placed in extension anchor bolts Ø6 mm bolts are recommended It is advised to drill the anchor bolt holes using a pattern with 127 mm hole spacing Improper hole spacing may result in the base industrial footing deformation when the screws are strongly tightened The PG 40 base industrial footing can be installed on a horizontal steel string Ø8 mm diameter recommended using clamping ban...

Page 9: ... mm hole spacing Improper hole spacing may result in the base industrial footing deformation when the screws are strongly tightened For wire connection a flat screw driver max edge width at 3 5 mm use is recommended it should be pushed see Fig 9 into the proper connector hole Then the wire closer to the ceiling should be placed into the hole and the screw driver should be taken off It is advised t...

Page 10: ...between 0o C to 40o C and relative humidity between 40 and 80 free of caustic gases and vapours Detector bases and base industrial footings should not be exposed to direct sun and heating elements influence The storage period of the detector bases and base industrial footings in transport packages should not exceed 24 months 8 TRANSPORTATION The G 40 bases and PG 40 base industrial footings should...

Reviews: