5.Preparation for installation
7
MANA DT SMA
POLITEC | INSTALLATION MANUAL - VER.3.1
5.1 Preparation of the barrier parts before installation
Since the communication between the barriers can take place wired, via wireless and their alignment
can be done optically, it is advisable to firstly check all the component parts of the barriers and any
accessories before beginning the installation.
5.2 It is advisable to carry out
:
•
A test of the configuration of the devices in a sheltered or closed environment;
•
a check on the operation of the optical and acoustic alignment
•
the permanent fixing of each device;
•
the preparation and carrying out of electrical connections.
In order to avoid errors, operating and installation problems, it is advisable to proceed as follows:
a) Place all the products with the package open on a table;
b) For the low consumption barrier version for wireless models with universal electronic board
housing, insert and connect the radio transmitter, and connect it to the barrier receiver board
cc) Power up the barriers and program them
d) Test barrier operation;
e) Place (without fixing) the barriers at the planned points;
f) Place (without fixing) all the other devices at the planned points;
g) Check for each barrier that there is sufficient field for radio communication (for wireless versions);
h) Permanently fix the barriers.
Before proceeding with the installation, it is necessary to check the integrity of the product, the
adequacy of the model chosen and the suitability of the environment intended for installation:
• Check that all conditions of use fall within the "limits of use" and in the "Technical specifications of
the product".
• Check that the environment chosen for the installation is compatible with the total footprint of the
product.
• Check that the surface chosen for the installation of the product is solid so as to ensure stable fixing
and that it is adequately protected from possible impacts or atmospheric agents.