8.Mounting the base on the cable pit
Insert all the connection cables through the cable glands mounted on the cover under the base,
leaving adequate space inside the cable pit and length in the column for making connections to the
terminal board.
Cover under the base with sealing OR, for cable entry with cable glands.
Once the necessary cables have been passed through, the bottom cover is fixed with the screws
supplied along with the corresponding gasket.
At the end of the operation, position the column on the cable pit and secure it with the bolts
provided.
If the column is set up with the kit for pole or wall fixing, use the cover under the base for the
passage of the cables, following the instructions as above and finally fix it in the same way to the
base.(see photo above)