FINAL DRIVE
7.12
the boot kit. DO NOT use a substitute grease and DO
NOT overfill or underfill the CV joint.
9.
Slide the new clamp and boot (small end first)
over the splined shaft, then slide (tap) the CV joint
into the splines of the axle. Install small boot
clamp.
10. Add grease through large end of boot.
11. Position large end of boot on CV joint, purge
excess air by partially compressing axle into CV
bell, lift one edge of boot to let out excess air
Secure
with
clamp.
Boot Replacement requires 30g
Boot replacement with complete CV
joint cleaning requires an additional
30g. (Total 60g)
CV Boot Clamp Pliers:
Earless Type
(PN 8700226)
CV Joint Grease - 30g (PN 1350046)
FRONT SHAFT
Joint Capacity
30 Grams
Boot Capacity
30 Grams
Front outboard joint capacity: 30g if boot
is replaced only. Another 30g (60g total) if
joint is cleaned.
Summary of Contents for A09BA50FA
Page 70: ...ENGINE 3 20 CYLINDER HEAD EXPLODED VIEW EH50PL EH50PL...
Page 120: ...FUEL SYSTEM CARBURETION 4 16 NOTES...
Page 216: ...BRAKES 9 24 NOTES...
Page 254: ...ELECTRICAL 10 38 NOTES...
Page 255: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...
Page 256: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...