
7
7.35
9924874 R02 - 2014
RZR
XP / XP 4 1000 Service Manual
© Copyright 2013 Polaris Industries Inc.
14. Use a soft-faced hammer to tap the joint onto the
drive shaft until it locks into place.
15. Pull on the joint to make sure it is securely locked in
place.
16. Remove excess grease from the CV joint's external
surfaces and place the excess grease in the boot.
17. Pull the boot over the joint and position the boot lips
into the grooves on the joint housing and shaft. Make
sure the boot is not dimpled or collapsed.
18. Install and tighten the large clamp using the
appropriate clamp tool.
Axle Boot Clamp Tool: PU-48951
or
CV Boot Clamp Pliers: 8700226
19. While pulling out on the CV shaft, fully extend the CV
joint and slide a straight O-ring pick or a small slotted
screw driver between the small end of the boot and
the shaft. This will allow the air pressure to equalize
in the CV boot in the position that the joint will spend
most of its life. Before you remove your instrument,
be sure the small end of the boot is in its correct
location on the shaft.
20. Install and tighten the small clamp on the boot using
the appropriate clamp tool.
Axle Boot Clamp Tool: PU-48951
or
CV Boot Clamp Pliers: 8700226
Inner Plunging Joint / Boot Replacement
1.
Use a side cutters to cut and discard the boot clamps
.
FINAL DRIVE
Summary of Contents for 2014 RZR XP 1000
Page 5: ......
Page 472: ...HARNESS CHASSIS RZR XP 1000 ...
Page 473: ...HARNESS CHASSIS RZR XP 1000 ...
Page 474: ...HARNESS BOX RZR XP 1000 ...