
3
3.77
9924874 R02 - 2014
RZR
XP / XP 4 1000 Service Manual
© Copyright 2013 Polaris Industries Inc.
4.
Carefully install the camshafts into the cylinder head.
The PTO camshaft lobes (Item 5) should face out as
shown.
5.
Carefully install the rear camshaft carriers onto the
camshafts. Carrier openings should face each other
when installed properly.
6.
Install the four bolts that retain each rear camshaft
carrier (Item 6) and tighten the bolts evenly until
snug.
7.
Install the Cylinder Holding & Camshaft Timing Plate
(PU-50563) into the end of camshafts as shown. Use
a 13/16” open-end wrench to rotate camshafts
slightly if needed.
8.
Verify the TDC mark on the flywheel is still properly
aligned (see Step 1).
9.
Pull cam chain upward, making sure it is engaged
with the drive sprocket on the crankshaft.
10. While lifting the cam chain up, engage the cam
sprockets into the chain with the “I” and “E” marks
facing out.
11. Install the sprockets onto the camshafts and align
the sprocket marks with the valve cover gasket
surface (see Camshaft Timing - Quick Reference,
page 3.80).
NOTE:
Intake cam sprocket should have “I”
marks aligned with gasket surface and the
exhaust cam sprocket should have “E” marks
aligned with gasket surface.
Install the exhaust cam sprocket first (opposite
the cam chain tensioner) to ensure proper cam
timing.
ENGINE
Summary of Contents for 2014 RZR XP 1000
Page 5: ......
Page 472: ...HARNESS CHASSIS RZR XP 1000 ...
Page 473: ...HARNESS CHASSIS RZR XP 1000 ...
Page 474: ...HARNESS BOX RZR XP 1000 ...