
6.26
9924874 R02 - 2014
RZR
XP / XP 4 1000 Service Manual
© Copyright 2013 Polaris Industries Inc.
14. Install sheave face down on puller.
15. Install new bushing on installation tool (Item 2) and
install assembly into sheave.
16. Install left hand thread nut (C) onto puller rod and
hand tighten against installation tool.
17. Turn clutch sheave counterclockwise, making sure
bushing is drawn straight into bore. Continue until
bushing is seated.
18. Remove nut (C) from puller rod and set aside.
19. Remove installation tool and clutch sheave from
puller.
Clutch Assembly
1.
Install a new bearing onto the clutch shaft using an
arbor press. Once bearing is fully seated, install a
new snap ring.
2.
Install the shaft and bearing assembly into the outer
sheave.
NOTE:
Press only on the outer race of the
bearing during installation to prevent damaging
the bearing.
CLUTCHING
Summary of Contents for 2014 RZR XP 1000
Page 5: ......
Page 472: ...HARNESS CHASSIS RZR XP 1000 ...
Page 473: ...HARNESS CHASSIS RZR XP 1000 ...
Page 474: ...HARNESS BOX RZR XP 1000 ...