
PMCA-20
Manual
20
11. Turn ON Control Power (P, page 13). Red pilot will light.
12. Set Pump Switch (T, page 13) to NORMAL. Turn Pneumatic Pressure Control
CLOCKWISE increasing
material pressure
to 400 psi. Both Material Pressure
Gauges (G, J, page 12) should read the same. Check all Heated Hose Coupling
connections for leakage.
13. Check the TSU for leaks and that all
“Fast-Lock” connections are tight and
electrical tape is installed over their set screws.
14. Bundle all Heated Hose Connections ensuring no TSU Cable or Air Hose kinks.
Wrap with Electrical Tape to securely hold all components in place and minimize
places for bundle to snag onto job site protrusions.
Summary of Contents for MN-06001
Page 11: ...PMCA 20 Manual 11 DESCRIPTION PMCA 20 ...
Page 43: ...PMCA 20 Manual 43 DOUBLE ACTING PROPORTIONING PUMP DIAGRAM FILL STROKE DISCHARGE STROKE ...
Page 44: ...PMCA 20 Manual 44 PART IDENTIFICATION Pump Line Assembly PL 4 PL 5 ...
Page 46: ...PMCA 20 Manual 46 Air Motor Assembly NE 06009 ...
Page 52: ...PMCA 20 Manual 52 Pre Heater Assembly PH 13 ...
Page 55: ...PMCA 20 Manual 55 Air Machine PMCA 20 1600 PMCA 20 2400 ...
Page 56: ...PMCA 20 Manual 56 ...
Page 61: ...PMCA 20 Manual 61 Hoses ...