000115682/151018/0 WallPro
EN - 11
4.7
Extraction arm
For assembly of the extraction arm(s), refer to the installation
manual of the KUA-160 or KUA-200, that is supplied with the
product.
4.7.1 LL-5.5/24 | Manual on/off switch on the hood,
incl. LED working light (option)
• Install the LL-5.5/24 in the hood of the extraction arm in
accordance with the instruction sheet that is supplied with
the product.
Subsequently:
• Feed the cable through the extraction arm to the rotating
flange (A).
• Feed the cable through the grommet into the cable gland
(B).
• Tighten the cable gland.
Fig. 4.11
B
A
G cable gland
• Release the hopper (D) to get access to the inside of the
unit.
• “DM” types only: Feed the cable through the reinforcement
plate (A).
• Remove the blind plug (C) from the nearest (left or right)
24
cable gland (B), just below the indicator panel.
• Feed the cable through the cable gland (B) inside the unit.
• Tighten the cable gland.
24. In case of a WallPro Double: use the left cable gland for the left arm and vice
versa
Fig. 4.12
B
A
DM
C
D
Cable connection
• Remove the cover of the indicator panel.
• Cut the cable to the appropriate length.
• Connect the cable as indicated below. The wire numbers
(#) correspond with those on the instruction sheet that is
supplied with the LL-5.5/24
25
.
Wire #
Colour
Connection
03
red
1
04
black
2
05
grey
2
06
blue
3
H6
H5
W
orking
Light
External
start/stop
1
2
2
3
4
5
6
7
8
1
2
2
3
4
5
6
7
8
X1
X1
Fig. 4.13 Cable connection inside indicator panel
ATTENTION!
Before you proceed, make sure that all cable glands
are fully tightened, to prevent leakage of dust.
4.7.2 Inlet ducting
In case of:
DM
25. Manual on/off switch on the hood, incl. LED working light