Gateway Commissioning & Start-up Guide
Modifying Schedule Times
To adjust the schedule start or end times, begin in the schedule editing screen.
Tap the specific schedule that is to be edited. Once selected, simply press and hold the circu-
lar button at either the beginning of the color-filled area (to adjust start time) or the end of the
color-filled area (to adjust end time) and drag to the desired time in 15-minute increments. The
schedule will update when the press is released.
Continue with schedule modifications or tap “Save” if finished.
Modifying Scheduled Days
To adjust the scheduled day groupings within the schedule editing screen, tap the “v” icon in the
upper-right segment of the screen visible next to abbreviated days of the week. A drop-down tool
will appear.
Tap the appropriate day grouping or create a new day grouping by referencing the process
outlined in page 49 of this document.
Continue with schedule modifications or tap “Save” if finished.