IF TOP SURFACE OF BEAM IS BOWED DOWN LIKE
THIS THEN TURN IT OVER SO THE BOW FACES UP.
A
4 X 6 X 108"
SWING BEAM
EMPTY
HOLE
EMPTY
HOLES
DETAIL A
SCALE 1 : 7
IRON DUCTILE SWING HANGER
TORQUE WASHER
3/8" X 6-1/2"
CARRIAGE BOLT
BOLT CAP
3/8" WASHER
3/8" LOCK NUT
STEP 26: IRON DUCTILE SWING HANGERS
THE REMAINING FIVE SWING HANGERS.
WASHERS. PLACE BOLT CAPS OVER ANY EXPOSED THREADS. REPEAT THIS PROCESS FOR
1: SIGHT DOWN THE LENGTH OF YOUR 4 X 6 X 108" SWING BEAM. IF THE TOP SURFACE OF
THE BEAM IS BOWED DOWN THEN TURN IT OVER SO THE BOW IS UP.
2: PLACE 3/8" X 6-1/2" CARRIAGE BOLTS WITH TORQUE WASHERS INTO THE HOLES SHOWN
BELOW TO ATTACH THE IRON DUCTILE SWING HANGERS. USE A HAMMER TO SET THE
TEETH OF EACH TORQUE WASHER INTO THE TOP OF THE SWING BEAM.
3: PLACE AN IRON DUCTILE SWING HANGER OVER THE ENDS OF THE CARRIAGE BOLTS.
FASTEN THE SWING HANGER TO THE SWING BEAM WITH 3/8" LOCK NUTS AND 3/8"
SIGHT ALONG END OF BEAM
LOOKING IN THE DIRECTION
OF THE ARROW SHOWN FOR
A BOW IN THE SWING BEAM.
51