STEP 24: REST SWING BEAMS ON FORT
AN EXTRA PERSON IS NEEDED FOR THIS STEP.
1: REST THE SWING BEAMS ON TOP OF THE FORT RAILINGS. THE END OF THE SWING BEAM WITH TWO EMPTY HOLES
SHOULD OVERHANG THE SIDE OF THE FORT WITH THE TRIANGULAR SWING BEAM PLATE.
2: SIT THE SWING BEAM LEGS UPRIGHT UNDER THE TWO EMPTY HOLES IN THE END OF THE SWING BEAMS.
SCALE 1 : 10
DETAIL A
SWING LEG BRACKET AND LEGS
2 HOLE END OF SWING BEAM RESTS
ON TOP OF SWING LEG BRACKET.
YOU WILL ATTACH THESE TOGETHER
IN THE NEXT STEP.
SWING BEAM
SWING LEG BRACKET
2 HOLE END OVER THE
SWING LEGS &
BRACKET ASSEMBLY
SWING LEG BRACKET
2 HOLE END OVER THE
BRACKET ASSEMBLY
SWING LEGS &
SWING BEAM ASSEMBLIES
A
60