background image

www.playcraftsystems.com

For Customer Service Call

800.333.8519 (U.S.A.) or 541.955.9199 (International)

TRANSFER STATION WITH HALF WALLS

INSTALLATION INSTRUCTIONS

Rev F

6/3/2020

1209-HW

Page 2 of 7

30

1

2

" *

774mm

18"

457mm

21

1

2

"

545mm

27"

*

686mm

6"

152

12"

305mm

12"

305mm

Optional Filter Fabric Over

Pea Gravel (for drainage)

Concrete Footing

Footing Anchor

Blocking, See

Installers Manual

2b Stone, drain rock

Undisturbed Soil

(Top of Soil)

LOOSE FILL SURFACING MATERIAL SHOWN:

9" compressed or 12" uncompressed depth.

Compressed depth shown. (See Note D)

19

11

16

"

501mm

13

3

4

"

349mm

16

13

16

"

427mm

X

(See Table)

31

13

16

"

809mm

15"

382mm

24"

610mm

(Finish Grade)

Footing Detail

Step 1

 

Refer to Footing Layout and mark footing hole locations. 

Dig (4) Ø 12" footing holes and (1) 12" x 24" oval footing 

hole. Refer to Footing Detail for depth and details.

IMPORTANT:

 For areas with soft soil conditions, larger 

footings may be required.  Optional Step Deck heights 

will require deeper footing holes.  Adjust footing 

locations for optional Step Deck orientations.
* Footing depth must be adjusted to compensate for the 

depth/thickness requirements of selected safety 

surfacing. See Section 06.1 of the Installation Manual.

Top View - Footing Layout

Footing Distance Table

Front of Deck to Center of Footing

Deck Height

X (in.)

X (mm)

24"

13-1/4"

337

36"

28-1/4"

616

48"

58-1/4"

1480

60"

73-1/4"

1861

Summary of Contents for Transfer Station with Half Walls 1209-HW

Page 1: ...ed and plumbed Concrete must be allowed to cure completely before using the equipment at least 72 hours C Refer to Installation Manual for 1309 Half Wall installation instructions D An appropriate ene...

Page 2: ...16 427mm X See Table 3113 16 809mm 15 382mm 24 610mm Finish Grade Footing Detail Step 1 Refer to Footing Layout and mark footing hole locations Dig 4 12 footing holes and 1 12 x 24 oval footing hole...

Page 3: ...x 1 O D Washer 1 2 SAE Washer TRANSFER RAIL HALF WALL Figure 1 2 Figure 1 3 3 8 x 2 1 2 Button Head Bolt 3 8 x 1 O D Washer 3 8 Lock Nut TRANSFER RAIL ADA STEPS Step 2 Factory Assembled Drive Transfe...

Page 4: ...RANSFER DECK TRANSFER DECK SUPPORT 3 8 x 1 O D Washer 3 8 Lock Nut 3 8 x 1 O D Washer 3 8 x 1 1 4 Button Head Bolt FIGURE 4 3 8 Lock Nut 3 8 x 1 O D Washer TRANSFER RAIL 3 8 x 1 O D Washer 3 8 x 1 1 4...

Page 5: ...D Washer 3 8 Lock Nut FIGURE 5 Step 11 Attach Step Deck Legs to Step Deck as shown in Figure 6 See Note A Step 12 Place Step Deck into footing hole and attach Step Deck to Transfer Deck using Filler...

Page 6: ...lt Button Head 3 8 x 1 1 4 16 9103072 TR Bolt Button Head 3 8 x 1 1 2 8 9103112 TR Bolt Button Head 3 8 x 2 1 2 4 9333002 Washer Flat 3 8 x 1 O D x 100 thick 54 9345002 Washer Flat SAE 1 2 2 9413002 N...

Page 7: ...ed 1 660 O D 11 gauge steel support 1 029 O D 14 gauge steel rails and 1 4 thick steel mounting tab The Transfer Wall shall have a multi stage baked on powder coat finish TRANSFER LEG TOP Shall be pre...

Reviews: