For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
TRANS-GLIDE ASSEMBLY
INSTALLATION INSTRUCTIONS
Rev B
10/13/2016
1975
Page 2 of 19
30
5
16
"
770mm
11
13
16
"
300mm
51
1
4
"
1302mm
86
5
8
"
2200mm
Concrete Footing
2b Stone, drain rock
Undisturbed Soil
LOOSE FILL SURFACING MATERIAL SHOWN:
9" compressed or 12" uncompressed depth.
Compressed depth shown. (See Note F)
Deck Gap
(Finish Grade)
(Top of Soil)
6
5
8
"
168mm
**
24"
610mm
15"
381mm
*
Footing Detail
Step 1
Refer to Footing Layout and mark footing hole
location. Dig (1) 86-5/8" x 51-1/4" footing hole.
Refer to Footing Detail for depth and details.
Pour concrete into footing hole. (See Note B)
IMPORTANT: For areas with soft soil
conditions, larger footings may be required.
* Footing depth must be adjusted to
compensate for the depth/thickness
requirements of selected safety surfacing.
See Section 06.1 of the Installation Manual.
** Height shown from top of deck to top of
collar.
Top View - Footing Layout
Driver Side
Passenger Side
Decks flush
1/4" [6mm]
(See Note E)
Detail View - Deck Gap
1-1/8" to 1-1/4"
(See Note E)